New construction of a production building with integrated testing and pre-development department (Q3297393): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Zollernalbkreis / rank | |||
Normal rank |
Revision as of 19:13, 24 October 2021
Project Q3297393 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | New construction of a production building with integrated testing and pre-development department |
Project Q3297393 in Germany |
Statements
126,900.0 Euro
0 references
253,800.0 Euro
0 references
50.0 percent
0 references
4 May 2016
0 references
3 May 2018
0 references
Die Goldfuß engineering GmbH entwickelt und produziert robotergestützte Beschickungssysteme für Verpackungsmaschinen und robotergestützte Anwendungslösungen zur Laborautomation. Durch die vollständige Automatisierung manueller Prozesse können ressourcenschonende Lösungen bei zugleich hoher Wirtschaftlichkeit erzielt werden. Mit der Förderung wird der Neubau eines Produktionsgebäudes mit integrierter Versuchs- und Vorentwicklungsabteilung unterstützt. (German)
0 references
Goldfuß engineering GmbH develops and produces robot-supported feeding systems for packaging machines and robot-supported application solutions for laboratory automation. Through the complete automation of manual processes, resource-saving solutions can be achieved at the same time high cost-effectiveness. The funding supports the construction of a production building with an integrated testing and pre-development department. (English)
24 October 2021
0 references
Balingen
0 references
Identifiers
DE_TEMPORARY_172
0 references