Interventions in the Drainage Network of Wastewater in Baixa in the municipality of Baião (SAR Frende) (Q2982671): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 99,575.85 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
117,148.0 Euro
Amount117,148.0 Euro
UnitEuro
Property / budget: 117,148.0 Euro / rank
 
Normal rank
Property / EU contribution
 
99,576.0 Euro
Amount99,576.0 Euro
UnitEuro
Property / EU contribution: 99,576.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 04:29, 22 October 2021

Project Q2982671 in Portugal
Language Label Description Also known as
English
Interventions in the Drainage Network of Wastewater in Baixa in the municipality of Baião (SAR Frende)
Project Q2982671 in Portugal

    Statements

    0 references
    99,576.0 Euro
    0 references
    117,148.0 Euro
    0 references
    85.0 percent
    0 references
    29 August 2017
    0 references
    6 February 2019
    0 references
    ÁGUAS DO NORTE, S.A.
    0 references
    Q3006399 (Deleted Item)
    0 references
    0 references

    41°7'31.66"N, 7°55'23.09"W
    0 references
    A operação visa o fecho de sistemas de drenagem de águas residuais em baixa no Município de Baião, com vista à otimização da capacidade instalada no SAR Frende e da extensão do serviço, pela disponibilização do serviço a cerca de 133 habitantes/80 alojamentos, através da construção de 1,16km de rede de drenagem de águas residuais e uma estação elevatória de águas residuais. O investimento elegível previsto no âmbito da Operação é de 131.323,74€. (Portuguese)
    0 references
    The operation aims to close down waste water drainage systems in the municipality of Baião, with a view to optimising the capacity installed in the SAR Frende and the extension of the service, by providing the service to approximately 133 inhabitants/80 accommodations, through the construction of 1.16 km of waste water drainage network and a sewage lifting station. The eligible investment foreseen under the Operation is EUR 131,323.74. (English)
    9 July 2021
    0 references
    Baião, Frende
    0 references

    Identifiers

    POSEUR-03-2012-FC-001068
    0 references