Chancellery/Pedrógão Sanitation Subsystem (Q2982013): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: budget (P474): 3,625,539.12 euro) |
(Changed an Item: modifying budgets in portugal one item from slovenia) |
||||||
Property / budget | |||||||
4,265,340.0 Euro
| |||||||
Property / budget: 4,265,340.0 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
3,625,539.0 Euro
| |||||||
Property / EU contribution: 3,625,539.0 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
85.0 percent
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Normal rank |
Revision as of 19:16, 21 October 2021
Project Q2982013 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Chancellery/Pedrógão Sanitation Subsystem |
Project Q2982013 in Portugal |
Statements
3,625,539.0 Euro
0 references
4,265,340.0 Euro
0 references
85.0 percent
0 references
1 January 2016
0 references
31 December 2021
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
A presente operação prevê a construção de uma ETAR e respetivas infraestruturas de ligação com as redes já existentes e sem tratamento no subsistema, assim como a construção/ampliação de redes para aumentar a cobertura, garantindo um adequado tratamento dos efluentes recolhidos e contribuindo para a melhoria da qualidade das massas de água. (Portuguese)
0 references
This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies. (English)
9 July 2021
0 references
Torres Novas
0 references
Identifiers
POSEUR-03-2012-FC-000034
0 references