Agglomeration Oslany, Čereňany – sewerage and WWTP (Q3099163): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3120044 / rank
 
Normal rank

Revision as of 20:54, 23 September 2021

Project Q3099163 in Slovakia
Language Label Description Also known as
English
Agglomeration Oslany, Čereňany – sewerage and WWTP
Project Q3099163 in Slovakia

    Statements

    0 references
    10,754,041.64 Euro
    0 references
    12,651,813.7 Euro
    0 references
    0.85 percent
    0 references
    1 June 2017
    0 references
    1 January 2022
    0 references
    Stredoslovenská vodárenská spoločnos, a.s.
    0 references
    0 references
    0 references

    48°43'27.16"N, 19°7'44.08"E
    0 references
    Projekt rieši vybudovanie splaškovej kanalizácie a čistiarní odpadových vôd v obciach Oslany a Čereňany, tvoriacich Aglomeráciu Oslany (podža Prílohy č. 7 Výzvy). Absencia funkčnej kanalizačnej siete patrí v oboch obciach ku hlavným environmentálnym problémom, ktoré sú nedoriešené už niekožko rokov. Nedobudovanos kanalizačnej siete v požadovanom rozsahu je limitujúcim faktorom ďalšieho  rozvoja  obcí a ohrozuje kvalitu životného prostredia v regióne.Ciež projektu bude zabezpečený prostredníctvom 2 hlavných aktivít projektu: Výstavba 2 nových ČOV 2200 EO v obciach Oslany a Čereňany; Výstavba a rozšírenie splaškovej kanalizácie v obciach Oslany a ČereňanyV obidvoch obciach  je stoková sie vybudovaná čiastočne, v obci Oslany sú vybudované  tri samostatné vetvy spolu v dĺžke 2,6 km, zvedené do 3 malých COV a dažďová kanalizácia pokrývajúc celú obec. V obci bude vybudovaná nová ČOV s kapacitou 2200 EO, do ktorej bude zaústená jednotná gravitačná splašková kanalizačná sie v celkovej dĺžke viac ako 16,5 km. Dĺžka novovybudovanej stokovej siete bude 13 917 m.V obci Čereňany v súčasnosti nie je vybudovaná funkčná splašková kanalizácia, čas z projektovanej kanalizácie v rámci I. etapy bola začatá, nie je však funkčná. Dĺžka novovybudovanej kanalizácie v obci bude 9 910 m a bude zaústená do novovybudovanej  ČOV s kapacitou 2200 EO.Realizáciou projektu dôjde k vybudovaniu kanalizačných sietí v celkovej dĺžke viac ako 23 km a tým k zabezpečeniu odvádzania a čistenia komunálnych vôd celkovo pre 4 100 EO predmetnej aglomerácie.  Zároveň budú vybudované 2 nové ČOV v súlade so smernicou Rady 91/271/EHS a Nariadením Vlády SR 269/2010 Z.z..Projektom sa zlepší kvalita životného prostredia a života obyvatežstva ako i ochrana povrchových a podzemných vôd v oblasti povodia rieky Váh a jeho prítokov Osliansky a Čereniansky potok. (Slovak)
    0 references
    The project is to build sewage sewerage and sewage treatment plants in the municipalities of Oslany and Čereňany, forming the agglomeration of Oslany (under Annex 7 Challenges). The absence of a functional sewerage network is one of the main environmental problems in both municipalities, which have not been resolved in a number of years. Failure to build a sewer network in the required extent is a limiting factor for further development of municipalities and threatens the quality of the environment in the region.Also, the project will be ensured through 2 main activities of the project: Construction of 2 new WWTP 2200 EO in the municipalities of Oslany and Čereňany; Construction and expansion of the sewage system in the villages Oslany and ČereňanyIn both villages is a sewer network built partly, in the village Oslany three separate branches are built together in the 2,6 km, ducted into 3 small COVs and daďová sewerage covering the whole village. A new WWTP with a capacity of 2200 EO will be built in the village, where a uniform gravity sewage network will be connected in a total of more than 16.5 km. The newly built sewer network will be 13917 m. In the village Čereňany is currently not built functional sewage system, time from the projected sewerage within the I. stage was started, is not functional. The column of the newly built sewerage system in the village will be 9910 m and will be connected to the newly built WWTP with a capacity of 2200 EO. The implementation of the project will be built sewerage networks in the total of more than 23 km and thus ensure the drainage and treatment of municipal water for a total of 4 100 EO of the agglomeration in question.  At the same time, 2 new WWTPs will be built in accordance with Council Directive 91/271/EEC and Regulation of the Government of the Slovak Republic 269/2010 Coll. The project defects the quality of the environment and the life of the population as well as the protection of surface and groundwater in the water catchment area of the river Váh and its tributaries Osliansky and Čereniansky potok. (English)
    15 September 2021
    0 references

    Identifiers

    310011A084
    0 references