Remodeling of the Mourão SAR (Q2982593): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 15:03, 15 September 2021

Project Q2982593 in Portugal
Language Label Description Also known as
English
Remodeling of the Mourão SAR
Project Q2982593 in Portugal

    Statements

    0 references
    33,848.69 Euro
    0 references
    1 November 2017
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE VILA FLOR
    0 references
    0 references
    0 references

    41°15'5.72"N, 7°12'43.88"W
    0 references
    Com esta operação pretende-se dotar a ETAR existente de uma obra de entrada que garanta a eficiência dos equipamentos a jusante, de modo a ser assegurado o tratamento satisfatório das águas residuais urbanas de 100 habitantes da localidade de Mourão, na União das freguesias de Valtorno e Mourão. (Portuguese)
    0 references
    With this operation it is intended to provide the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of 100 inhabitants of the locality of Mourão, in the Union of the parishes of Valtorno and Mourão. (English)
    9 July 2021
    0 references
    Vila Flor, União das freguesias de Valtorno e Mourão
    0 references

    Identifiers

    POSEUR-03-2012-FC-000852
    0 references