Requalification of the Tondela Norte System (Q2982902): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:58, 15 September 2021

Project Q2982902 in Portugal
Language Label Description Also known as
English
Requalification of the Tondela Norte System
Project Q2982902 in Portugal

    Statements

    0 references
    841,029.92 Euro
    0 references
    1 September 2020
    0 references
    30 November 2022
    0 references
    AINTAR - ASSOCIAÇÃO DE MUNICÍPIOS PARA O SISTEMA INTERMUNICIPAL DE ÁGUAS RESIDUAIS DE CARREGAL DO SAL, SANTA COMBA DÃO, TÁBUA E TONDELA
    0 references
    0 references
    0 references

    40°30'59.11"N, 8°4'49.91"W
    0 references
    A reabilitação e ampliação da ETAR de Tondela, deverá servir 11.000 habitantes. Serão ainda desativadas quatro ETAR de pequena dimensão, que causam pressão sobre a massa de água, e que se revelam insuficientes para o tratamento das águas residuais geradas, o que geram qualidade de água tratada com parâmetros deficitários. (Portuguese)
    0 references
    The rehabilitation and expansion of the Tondela treatment plant is expected to serve 11,000 inhabitants. Four small sewage treatment plants will also be deactivated, which cause pressure on the body of water, and which prove to be insufficient for the treatment of the waste water generated, which generate quality of water treated with deficit parameters. (English)
    9 July 2021
    0 references
    Tondela
    0 references

    Identifiers

    POSEUR-03-2012-FC-001367
    0 references