Wastewater drainage of Bravães (Q2982473): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:45, 15 September 2021

Project Q2982473 in Portugal
Language Label Description Also known as
English
Wastewater drainage of Bravães
Project Q2982473 in Portugal

    Statements

    0 references
    222,511.16 Euro
    0 references
    1 June 2017
    0 references
    29 February 2020
    0 references
    MUNICÍPIO DE PONTE DA BARCA
    0 references
    0 references

    41°47'51.68"N, 8°27'3.49"W
    0 references
    A solução proposta no Estudo do projeto do Saneamento de Águas Residuais em Bravães e Lavradas aponta para a divisão da zona em três bacias de drenagem.Os efluentes da terceira bacia deverão ser integrados, por elevação, na rede existente de Oleiros, que tem como destino final a atual ETAR de Ponte da Barca. (Portuguese)
    0 references
    The solution proposed in the Study of the Wastewater Sanitation Project in Bravães and Lavradas points to the division of the zone into three drainage basins.The effluents of the third alguidar should be integrated, by elevation, into the existing Oleiros network, which has as its final destination the current treatment plant of Ponte da Barca. (English)
    9 July 2021
    0 references
    Ponte da Barca, Bravães
    0 references

    Identifiers

    POSEUR-03-2012-FC-000674
    0 references