Q3099163 (Q3099163): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: import item from Slovakia) |
(Created claim: summary (P836): The project is to build sewage sewerage and sewage treatment plants in the municipalities of Oslany and Čereňany, forming the agglomeration of Oslany (under Annex 7 Challenges). The absence of a functional sewerage network is one of the main environmental problems in both municipalities, which have not been resolved in a number of years. Failure to build a sewer network in the required extent is a limiting factor for further development of munic...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is to build sewage sewerage and sewage treatment plants in the municipalities of Oslany and Čereňany, forming the agglomeration of Oslany (under Annex 7 Challenges). The absence of a functional sewerage network is one of the main environmental problems in both municipalities, which have not been resolved in a number of years. Failure to build a sewer network in the required extent is a limiting factor for further development of municipalities and threatens the quality of the environment in the region.Also, the project will be ensured through 2 main activities of the project: Construction of 2 new WWTP 2200 EO in the municipalities of Oslany and Čereňany; Construction and expansion of the sewage system in the villages Oslany and ČereňanyIn both villages is a sewer network built partly, in the village Oslany three separate branches are built together in the 2,6 km, ducted into 3 small COVs and daďová sewerage covering the whole village. A new WWTP with a capacity of 2200 EO will be built in the village, where a uniform gravity sewage network will be connected in a total of more than 16.5 km. The newly built sewer network will be 13917 m. In the village Čereňany is currently not built functional sewage system, time from the projected sewerage within the I. stage was started, is not functional. The column of the newly built sewerage system in the village will be 9910 m and will be connected to the newly built WWTP with a capacity of 2200 EO. The implementation of the project will be built sewerage networks in the total of more than 23 km and thus ensure the drainage and treatment of municipal water for a total of 4 100 EO of the agglomeration in question. At the same time, 2 new WWTPs will be built in accordance with Council Directive 91/271/EEC and Regulation of the Government of the Slovak Republic 269/2010 Coll. The project defects the quality of the environment and the life of the population as well as the protection of surface and groundwater in the water catchment area of the river Váh and its tributaries Osliansky and Čereniansky potok. (English) | |||||||||||||||
Property / summary: The project is to build sewage sewerage and sewage treatment plants in the municipalities of Oslany and Čereňany, forming the agglomeration of Oslany (under Annex 7 Challenges). The absence of a functional sewerage network is one of the main environmental problems in both municipalities, which have not been resolved in a number of years. Failure to build a sewer network in the required extent is a limiting factor for further development of municipalities and threatens the quality of the environment in the region.Also, the project will be ensured through 2 main activities of the project: Construction of 2 new WWTP 2200 EO in the municipalities of Oslany and Čereňany; Construction and expansion of the sewage system in the villages Oslany and ČereňanyIn both villages is a sewer network built partly, in the village Oslany three separate branches are built together in the 2,6 km, ducted into 3 small COVs and daďová sewerage covering the whole village. A new WWTP with a capacity of 2200 EO will be built in the village, where a uniform gravity sewage network will be connected in a total of more than 16.5 km. The newly built sewer network will be 13917 m. In the village Čereňany is currently not built functional sewage system, time from the projected sewerage within the I. stage was started, is not functional. The column of the newly built sewerage system in the village will be 9910 m and will be connected to the newly built WWTP with a capacity of 2200 EO. The implementation of the project will be built sewerage networks in the total of more than 23 km and thus ensure the drainage and treatment of municipal water for a total of 4 100 EO of the agglomeration in question. At the same time, 2 new WWTPs will be built in accordance with Council Directive 91/271/EEC and Regulation of the Government of the Slovak Republic 269/2010 Coll. The project defects the quality of the environment and the life of the population as well as the protection of surface and groundwater in the water catchment area of the river Váh and its tributaries Osliansky and Čereniansky potok. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is to build sewage sewerage and sewage treatment plants in the municipalities of Oslany and Čereňany, forming the agglomeration of Oslany (under Annex 7 Challenges). The absence of a functional sewerage network is one of the main environmental problems in both municipalities, which have not been resolved in a number of years. Failure to build a sewer network in the required extent is a limiting factor for further development of municipalities and threatens the quality of the environment in the region.Also, the project will be ensured through 2 main activities of the project: Construction of 2 new WWTP 2200 EO in the municipalities of Oslany and Čereňany; Construction and expansion of the sewage system in the villages Oslany and ČereňanyIn both villages is a sewer network built partly, in the village Oslany three separate branches are built together in the 2,6 km, ducted into 3 small COVs and daďová sewerage covering the whole village. A new WWTP with a capacity of 2200 EO will be built in the village, where a uniform gravity sewage network will be connected in a total of more than 16.5 km. The newly built sewer network will be 13917 m. In the village Čereňany is currently not built functional sewage system, time from the projected sewerage within the I. stage was started, is not functional. The column of the newly built sewerage system in the village will be 9910 m and will be connected to the newly built WWTP with a capacity of 2200 EO. The implementation of the project will be built sewerage networks in the total of more than 23 km and thus ensure the drainage and treatment of municipal water for a total of 4 100 EO of the agglomeration in question. At the same time, 2 new WWTPs will be built in accordance with Council Directive 91/271/EEC and Regulation of the Government of the Slovak Republic 269/2010 Coll. The project defects the quality of the environment and the life of the population as well as the protection of surface and groundwater in the water catchment area of the river Váh and its tributaries Osliansky and Čereniansky potok. (English) / qualifier | |||||||||||||||
point in time: 15 September 2021
|
Revision as of 13:10, 15 September 2021
Project Q3099163 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3099163 in Slovakia |
Statements
10,754,041.64 Euro
0 references
12,651,813.7 Euro
0 references
0.85 percent
0 references
1 June 2017
0 references
1 January 2022
0 references
Stredoslovenská vodárenská spoločnos, a.s.
0 references
Projekt riei vybudovanie splakovej kanalizácie a čistiarní odpadových vôd v obciach Oslany a Čereňany, tvoriacich Aglomeráciu Oslany (podža Prílohy č. 7 Výzvy). Absencia funkčnej kanalizačnej siete patrí v oboch obciach ku hlavným environmentálnym problémom, ktoré sú nedorieené u niekožko rokov. Nedobudovanos kanalizačnej siete v poadovanom rozsahu je limitujúcim faktorom ďalieho rozvoja obcí a ohrozuje kvalitu ivotného prostredia v regióne.Ciež projektu bude zabezpečený prostredníctvom 2 hlavných aktivít projektu: Výstavba 2 nových ČOV 2200 EO v obciach Oslany a Čereňany; Výstavba a rozírenie splakovej kanalizácie v obciach Oslany a ČereňanyV obidvoch obciach je stoková sie vybudovaná čiastočne, v obci Oslany sú vybudované tri samostatné vetvy spolu v dĺke 2,6 km, zvedené do 3 malých COV a daďová kanalizácia pokrývajúc celú obec. V obci bude vybudovaná nová ČOV s kapacitou 2200 EO, do ktorej bude zaústená jednotná gravitačná splaková kanalizačná sie v celkovej dĺke viac ako 16,5 km. Dĺka novovybudovanej stokovej siete bude 13 917 m.V obci Čereňany v súčasnosti nie je vybudovaná funkčná splaková kanalizácia, čas z projektovanej kanalizácie v rámci I. etapy bola začatá, nie je vak funkčná. Dĺka novovybudovanej kanalizácie v obci bude 9 910 m a bude zaústená do novovybudovanej ČOV s kapacitou 2200 EO.Realizáciou projektu dôjde k vybudovaniu kanalizačných sietí v celkovej dĺke viac ako 23 km a tým k zabezpečeniu odvádzania a čistenia komunálnych vôd celkovo pre 4 100 EO predmetnej aglomerácie. Zároveň budú vybudované 2 nové ČOV v súlade so smernicou Rady 91/271/EHS a Nariadením Vlády SR 269/2010 Z.z..Projektom sa zlepí kvalita ivotného prostredia a ivota obyvatežstva ako i ochrana povrchových a podzemných vôd v oblasti povodia rieky Váh a jeho prítokov Osliansky a Čereniansky potok. (Slovak)
0 references
The project is to build sewage sewerage and sewage treatment plants in the municipalities of Oslany and Čereňany, forming the agglomeration of Oslany (under Annex 7 Challenges). The absence of a functional sewerage network is one of the main environmental problems in both municipalities, which have not been resolved in a number of years. Failure to build a sewer network in the required extent is a limiting factor for further development of municipalities and threatens the quality of the environment in the region.Also, the project will be ensured through 2 main activities of the project: Construction of 2 new WWTP 2200 EO in the municipalities of Oslany and Čereňany; Construction and expansion of the sewage system in the villages Oslany and ČereňanyIn both villages is a sewer network built partly, in the village Oslany three separate branches are built together in the 2,6 km, ducted into 3 small COVs and daďová sewerage covering the whole village. A new WWTP with a capacity of 2200 EO will be built in the village, where a uniform gravity sewage network will be connected in a total of more than 16.5 km. The newly built sewer network will be 13917 m. In the village Čereňany is currently not built functional sewage system, time from the projected sewerage within the I. stage was started, is not functional. The column of the newly built sewerage system in the village will be 9910 m and will be connected to the newly built WWTP with a capacity of 2200 EO. The implementation of the project will be built sewerage networks in the total of more than 23 km and thus ensure the drainage and treatment of municipal water for a total of 4 100 EO of the agglomeration in question. At the same time, 2 new WWTPs will be built in accordance with Council Directive 91/271/EEC and Regulation of the Government of the Slovak Republic 269/2010 Coll. The project defects the quality of the environment and the life of the population as well as the protection of surface and groundwater in the water catchment area of the river Váh and its tributaries Osliansky and Čereniansky potok. (English)
15 September 2021
0 references
Identifiers
310011A084
0 references