Urban transport terminal Brasov railway station (Q2746695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
Tag: Replaced
(‎Changed an Item)
Property / instance of
 
Property / instance of: Kohesio project / rank
 
Normal rank
Property / financed by
 
Property / financed by: European Union / rank
 
Normal rank
Property / country
 
Property / country: Romania / rank
 
Normal rank
Property / EU contribution
 
12,148,435.64 Romanian Leu
Amount12,148,435.64 Romanian Leu
UnitRomanian Leu
Property / EU contribution: 12,148,435.64 Romanian Leu / rank
 
Normal rank
Property / EU contribution
 
2,429,687.128 Euro
Amount2,429,687.128 Euro
UnitEuro
Property / EU contribution: 2,429,687.128 Euro / rank
 
Preferred rank
Property / EU contribution: 2,429,687.128 Euro / qualifier
 
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
Property / EU contribution: 2,429,687.128 Euro / qualifier
 
point in time: 13 September 2021
Timestamp+2021-09-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / budget
 
14,292,277.22 Romanian Leu
Amount14,292,277.22 Romanian Leu
UnitRomanian Leu
Property / budget: 14,292,277.22 Romanian Leu / rank
 
Normal rank
Property / budget
 
2,858,455.444 Euro
Amount2,858,455.444 Euro
UnitEuro
Property / budget: 2,858,455.444 Euro / rank
 
Preferred rank
Property / budget: 2,858,455.444 Euro / qualifier
 
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
Property / budget: 2,858,455.444 Euro / qualifier
 
point in time: 13 September 2021
Timestamp+2021-09-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / co-financing rate
 
0.85 percent
Amount0.85 percent
Unitpercent
Property / co-financing rate: 0.85 percent / rank
 
Normal rank
Property / start time
 
8 May 2020
Timestamp+2020-05-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / start time: 8 May 2020 / rank
 
Normal rank
Property / end time
 
31 March 2022
Timestamp+2022-03-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 31 March 2022 / rank
 
Normal rank
Property / beneficiary name (string)
 
MUNICIPIUL BRASOV
Property / beneficiary name (string): MUNICIPIUL BRASOV / rank
 
Normal rank
Property / location (string)
 
Municipiul Braşov, Romania
Property / location (string): Municipiul Braşov, Romania / rank
 
Normal rank
Property / summary
 
La nivelul municipiului Brasov si a zonei metropolitane (suprapusa Polului de Crestere Brasov in ciclul de programare 2007-2013) au fost elaborate doua documente strategice esentiale pentru dezvoltarea durabila a acestei zone. Astfel, Planul de mobilitate urbana durabila al Polului de Crestere Brasov si Strategia Integrata de Dezvoltare Urbana Brasov elaborate in perioada 2014-2016 au analizat situatia existenta si au identificat o serie de deficiente in ceea ce priveste mobilitatea si accesibilitatea municipiului Brasov si a zonei metropolitane. Astfel, cresterea calitatii vietii din ultimul deceniu a avut ca efect cresterea numarului de autoturisme si, implicit, cresterea numarului deplasarilor cu autoturismul personal in defavoarea transportului public sau a modurilor nemotorizate. In conditiile cresterii constante a numarului de autoturisme individuale (atat ale rezidentilor cat si ale navetistilor sau turistilor), modelul actual de trafic si-a atins limitele si nu mai dispune de capacitatea de adaptare/extindere. Acest fapt este confirmat de urmatoarele aspecte: - atractivitatea scazuta a sistemului de transport public ca urmare a flotei invechite, a intarzierilor datorate volumelor mari de trafic si a lipsei infrastructurii specifice care sa faciliteze transferul intermodal de la / catre transport public - transport intrajudetean, transport feroviar, ciclism - procesul accentuat de suburbanizare concretizat in apariţia de zone rezidenţiale noi in proximitatea municipiului Brasov precum si tendinta de relocare a intreprinderilor, implicit a fortei de munca, dinspre centrul urban catre periferii determina fluxuri bi-directionale intre municipiul Brasov si zona metropolitana ce depasesc 25.000 de persoane zilnic - cresterea rapida a valorilor de trafic si a a duratei de deplasare - depasirea capacitatii parcarilor, in special in zona centrala a municipiului si a concentrarilor de puncte de interes, inclusiv zona Garii Brasov - formarea de ambuteiaje, in special in orele de varf - existenta de puncte negre cu risc ridicat de accidente rutiere - cresterea emisiilor de carbon (NOx, PM10 etc) In acest context, scopul proiectului este de a creste atractivitatea sistemului de transport public din municipiu prin amenajarea unui terminal modern in zona garii Brasov care sa asigure un transfer intermodal eficient, rapid si confortabil. Obiectivul general al proiectului este reducerea emisiilor GES in municipiul Brasov prin incurajarea schimbarii modale de la transportul auto privat la transportul public. Planul de mobilitate urbana durabila al Polului de Crestere Brasov a analizat evolutia viitoare a mobilitatii urbane din perspectiva a doua scenarii, astfel: - scenariul „a face minimum” presupune exclusiv realizarea/finalizarea proiectelor angajate pana la momentul elaborarii PMUD, fapt ce va duce la scaderea calitatii vietii prin lipsa de masuri care sa contracareze efectele cresterii numarului de vehicule private, degradarii calitatii di (Romanian)
Property / summary: La nivelul municipiului Brasov si a zonei metropolitane (suprapusa Polului de Crestere Brasov in ciclul de programare 2007-2013) au fost elaborate doua documente strategice esentiale pentru dezvoltarea durabila a acestei zone. Astfel, Planul de mobilitate urbana durabila al Polului de Crestere Brasov si Strategia Integrata de Dezvoltare Urbana Brasov elaborate in perioada 2014-2016 au analizat situatia existenta si au identificat o serie de deficiente in ceea ce priveste mobilitatea si accesibilitatea municipiului Brasov si a zonei metropolitane. Astfel, cresterea calitatii vietii din ultimul deceniu a avut ca efect cresterea numarului de autoturisme si, implicit, cresterea numarului deplasarilor cu autoturismul personal in defavoarea transportului public sau a modurilor nemotorizate. In conditiile cresterii constante a numarului de autoturisme individuale (atat ale rezidentilor cat si ale navetistilor sau turistilor), modelul actual de trafic si-a atins limitele si nu mai dispune de capacitatea de adaptare/extindere. Acest fapt este confirmat de urmatoarele aspecte: - atractivitatea scazuta a sistemului de transport public ca urmare a flotei invechite, a intarzierilor datorate volumelor mari de trafic si a lipsei infrastructurii specifice care sa faciliteze transferul intermodal de la / catre transport public - transport intrajudetean, transport feroviar, ciclism - procesul accentuat de suburbanizare concretizat in apariţia de zone rezidenţiale noi in proximitatea municipiului Brasov precum si tendinta de relocare a intreprinderilor, implicit a fortei de munca, dinspre centrul urban catre periferii determina fluxuri bi-directionale intre municipiul Brasov si zona metropolitana ce depasesc 25.000 de persoane zilnic - cresterea rapida a valorilor de trafic si a a duratei de deplasare - depasirea capacitatii parcarilor, in special in zona centrala a municipiului si a concentrarilor de puncte de interes, inclusiv zona Garii Brasov - formarea de ambuteiaje, in special in orele de varf - existenta de puncte negre cu risc ridicat de accidente rutiere - cresterea emisiilor de carbon (NOx, PM10 etc) In acest context, scopul proiectului este de a creste atractivitatea sistemului de transport public din municipiu prin amenajarea unui terminal modern in zona garii Brasov care sa asigure un transfer intermodal eficient, rapid si confortabil. Obiectivul general al proiectului este reducerea emisiilor GES in municipiul Brasov prin incurajarea schimbarii modale de la transportul auto privat la transportul public. Planul de mobilitate urbana durabila al Polului de Crestere Brasov a analizat evolutia viitoare a mobilitatii urbane din perspectiva a doua scenarii, astfel: - scenariul „a face minimum” presupune exclusiv realizarea/finalizarea proiectelor angajate pana la momentul elaborarii PMUD, fapt ce va duce la scaderea calitatii vietii prin lipsa de masuri care sa contracareze efectele cresterii numarului de vehicule private, degradarii calitatii di (Romanian) / rank
 
Normal rank
Property / programme
 
Property / programme: Integrated Regional Programme - RO - ERDF / rank
 
Normal rank
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 11:52, 14 September 2021

Project Q2746695 in Romania
Language Label Description Also known as
English
Urban transport terminal Brasov railway station
Project Q2746695 in Romania

    Statements

    0 references
    12,148,435.64 Romanian Leu
    0 references
    2,429,687.128 Euro
    13 September 2021
    0 references
    14,292,277.22 Romanian Leu
    0 references
    2,858,455.444 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    8 May 2020
    0 references
    31 March 2022
    0 references
    MUNICIPIUL BRASOV
    0 references
    La nivelul municipiului Brasov si a zonei metropolitane (suprapusa Polului de Crestere Brasov in ciclul de programare 2007-2013) au fost elaborate doua documente strategice esentiale pentru dezvoltarea durabila a acestei zone. Astfel, Planul de mobilitate urbana durabila al Polului de Crestere Brasov si Strategia Integrata de Dezvoltare Urbana Brasov elaborate in perioada 2014-2016 au analizat situatia existenta si au identificat o serie de deficiente in ceea ce priveste mobilitatea si accesibilitatea municipiului Brasov si a zonei metropolitane. Astfel, cresterea calitatii vietii din ultimul deceniu a avut ca efect cresterea numarului de autoturisme si, implicit, cresterea numarului deplasarilor cu autoturismul personal in defavoarea transportului public sau a modurilor nemotorizate. In conditiile cresterii constante a numarului de autoturisme individuale (atat ale rezidentilor cat si ale navetistilor sau turistilor), modelul actual de trafic si-a atins limitele si nu mai dispune de capacitatea de adaptare/extindere. Acest fapt este confirmat de urmatoarele aspecte: - atractivitatea scazuta a sistemului de transport public ca urmare a flotei invechite, a intarzierilor datorate volumelor mari de trafic si a lipsei infrastructurii specifice care sa faciliteze transferul intermodal de la / catre transport public - transport intrajudetean, transport feroviar, ciclism - procesul accentuat de suburbanizare concretizat in apariţia de zone rezidenţiale noi in proximitatea municipiului Brasov precum si tendinta de relocare a intreprinderilor, implicit a fortei de munca, dinspre centrul urban catre periferii determina fluxuri bi-directionale intre municipiul Brasov si zona metropolitana ce depasesc 25.000 de persoane zilnic - cresterea rapida a valorilor de trafic si a a duratei de deplasare - depasirea capacitatii parcarilor, in special in zona centrala a municipiului si a concentrarilor de puncte de interes, inclusiv zona Garii Brasov - formarea de ambuteiaje, in special in orele de varf - existenta de puncte negre cu risc ridicat de accidente rutiere - cresterea emisiilor de carbon (NOx, PM10 etc) In acest context, scopul proiectului este de a creste atractivitatea sistemului de transport public din municipiu prin amenajarea unui terminal modern in zona garii Brasov care sa asigure un transfer intermodal eficient, rapid si confortabil. Obiectivul general al proiectului este reducerea emisiilor GES in municipiul Brasov prin incurajarea schimbarii modale de la transportul auto privat la transportul public. Planul de mobilitate urbana durabila al Polului de Crestere Brasov a analizat evolutia viitoare a mobilitatii urbane din perspectiva a doua scenarii, astfel: - scenariul „a face minimum” presupune exclusiv realizarea/finalizarea proiectelor angajate pana la momentul elaborarii PMUD, fapt ce va duce la scaderea calitatii vietii prin lipsa de masuri care sa contracareze efectele cresterii numarului de vehicule private, degradarii calitatii di (Romanian)
    0 references
    Municipiul Braşov, Romania
    0 references

    Identifiers

    126997
    0 references