Reconstruction of Jūrmala Sports School swimming pool building and improvement of energy efficiency (Q3057090): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item)
Property / co-financing rate
 
0.37 percent
Amount0.37 percent
Unitpercent
Property / co-financing rate: 0.37 percent / rank
 
Normal rank

Revision as of 14:12, 10 September 2021

Project Q3057090 in Latvia
Language Label Description Also known as
English
Reconstruction of Jūrmala Sports School swimming pool building and improvement of energy efficiency
Project Q3057090 in Latvia

    Statements

    0 references
    471,756.78 Euro
    0 references
    1,289,745.3 Euro
    0 references
    0.37 percent
    0 references
    29 March 2019
    0 references
    28 January 2021
    0 references
    Jūrmalas pilsētas dome
    0 references
    0 references

    56°57'20.27"N, 23°36'47.99"E
    0 references
    Projekta mērķis - samazināt primārās enerģijas gada patēriņu Jūrmalas Sporta skolas peldbaseinu ēkā, Rūpniecības ielā 13 k-4, Jūrmalā par 318,09 kWh/m2, veicot ieguldījumus pašvaldības ēkā, sekmēt energoefektivitātes paaugstināšanu un pašvaldību izdevumu samazināšanos par siltumapgādi.Projekta ietvaros plānots veikt šadus pasākumus: 1. Ēkas ārsienu, ieskaitot cokola un pamatu, pārejas grīdas pārseguma siltināšanu; 2. Jumta (augšējā pārseguma) siltināšanu, jauna jumta seguma izveidošanu; 3. Logu un durvju nomaiņu uz jauniem blīviem logiem un durvīm; 4. Apkures sistēmas pārbūvi, t.sk. siltummezgla modernizāciju; 5. Jauna LED tipa energoefektīva apgaismojuma uzstādīšanu un jaunu iekšējās elektroinstalācijas sistēmas izbūvi. 6. Ventilācijas sistēmas pārbūvi;7. Ūdensvada un kanalizācijas sistēmas pārbūvi;8. Baseina pārklāja ierīkošanu;9. Ēkas iekštelpu un inženierkomunikāciju pārbūvi. Projekta īstenošanas rezultātā plānotais vidējais siltumenerģijas patēriņš apkurei pēc renovācijas – 61,87 kWh/m2 gadā, primārās enerģijas gada patēriņa samazinājums pēc darbu pabeigšanas – 318,09 kWh/m2 gadā, aprēķinātais siltumnīcefekta gāzu samazinājums gadā (CO2 ekvivalents tonnās) – 193,35 t gadā, kā arī veikta ēkas ar kopējo platību 3020,20 m2 energoefektivitātes paaugstināšana un pārbūve. Projekta kopējās izmaksas -2 959 110,15 EUR, t.sk. Eiropas Reģionālās attīstības fonda līdzfinansējums - 471 756,78 EUR; Valsts budžeta dotācija - 122 693,47 EUR; Pašvaldības finansējums - 695 295,05 EUR Neattieicnāmās izmaksas - 1 669 364.85 EUR. Projektu plānots īstenot 22 (divdesmit divi) mēnešos. (Latvian)
    0 references
    The aim of the project – to reduce the annual consumption of primary energy in the swimming pool building of Jūrmala Sports School, 13 k-4, in Jurmala by 318.09 kWh/m², by investing in the municipal building, to promote energy efficiency and reduction of municipal expenditure on heating. 1. Insulation of the transition floor covering of the building exterior, including cap and foundation; 2. Insulation of roof (upper cover), creation of new roofing; 3. Replacement of windows and doors to new dense windows and doors; 4. Reconstruction of the heating system, including modernisation of the heating unit; 5. Installation of new LED-type energy efficient lighting and construction of new internal wiring system. 6. Reconstruction of the ventilation system;7. Reconstruction of the water main and sewerage system;8. Construction of a basin cover;9. Reconstruction of the building’s indoor and engineering communications. The project results in the planned average heat consumption for heating after renovation – 61,87 kWh/m² per year, reduction of annual primary energy consumption after completion of works – 318.09 kWh/m² per year, estimated annual greenhouse gas reduction (CO2 equivalent tons) – 193.35 t per year, as well as energy efficiency improvement and reconstruction of a building with a total area of 3020.20 m². Total cost of the project – EUR 2959110,15, incl. Co-financing from the European Regional Development Fund – EUR 471756,78; State budget grant – EUR 122693,47; Municipal funding – EUR 695295,05 Indirectable costs – EUR 1669364.85. The project is planned to be implemented in 22 (twenty-two) months. (English)
    15 July 2021
    0 references
    Rūpniecības iela 13 k-4, Jūrmala, LV-2016
    0 references

    Identifiers

    4.2.2.0/18/I/013
    0 references