Wastewater drainage of Bravães (Q2982473): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The solution proposed in the Study of the Wastewater Sanitation Project in Bravães and Lavradas points to the division of the zone into three drainage basins.The effluents of the third alguidar should be integrated, by elevation, into the existing Oleiros network, which has as its final destination the current treatment plant of Ponte da Barca., translated_summary)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Ponte da Barca / rank
 
Normal rank

Revision as of 08:27, 9 July 2021

Project Q2982473 in Portugal
Language Label Description Also known as
English
Wastewater drainage of Bravães
Project Q2982473 in Portugal

    Statements

    0 references
    222,511.16 Euro
    0 references
    85.0 percent
    0 references
    1 June 2017
    0 references
    29 February 2020
    0 references
    MUNICÍPIO DE PONTE DA BARCA
    0 references
    0 references

    41°47'51.68"N, 8°27'3.49"W
    0 references
    A solução proposta no Estudo do projeto do Saneamento de Águas Residuais em Bravães e Lavradas aponta para a divisão da zona em três bacias de drenagem.Os efluentes da terceira bacia deverão ser integrados, por elevação, na rede existente de Oleiros, que tem como destino final a atual ETAR de Ponte da Barca. (Portuguese)
    0 references
    The solution proposed in the Study of the Wastewater Sanitation Project in Bravães and Lavradas points to the division of the zone into three drainage basins.The effluents of the third alguidar should be integrated, by elevation, into the existing Oleiros network, which has as its final destination the current treatment plant of Ponte da Barca. (English)
    9 July 2021
    0 references
    Ponte da Barca, Bravães
    0 references

    Identifiers

    POSEUR-03-2012-FC-000674
    0 references