Q2982208 (Q2982208): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The operation is aimed at the construction of the Reguengo treatment plant for the treatment of residual water in the Reguengo urban agglomerate. This cluster is currently served by a septic tank that presents several deficiencies, and its deactivation is urgently needed. Its implementation will contribute to improving the quality of the water bodies of the Guadiana river basin., translated_summary)
Property / summary
 
The operation is aimed at the construction of the Reguengo treatment plant for the treatment of residual water in the Reguengo urban agglomerate. This cluster is currently served by a septic tank that presents several deficiencies, and its deactivation is urgently needed. Its implementation will contribute to improving the quality of the water bodies of the Guadiana river basin. (English)
Property / summary: The operation is aimed at the construction of the Reguengo treatment plant for the treatment of residual water in the Reguengo urban agglomerate. This cluster is currently served by a septic tank that presents several deficiencies, and its deactivation is urgently needed. Its implementation will contribute to improving the quality of the water bodies of the Guadiana river basin. (English) / rank
 
Normal rank
Property / summary: The operation is aimed at the construction of the Reguengo treatment plant for the treatment of residual water in the Reguengo urban agglomerate. This cluster is currently served by a septic tank that presents several deficiencies, and its deactivation is urgently needed. Its implementation will contribute to improving the quality of the water bodies of the Guadiana river basin. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:55, 9 July 2021

Project Q2982208 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982208 in Portugal

    Statements

    0 references
    159,299.39 Euro
    0 references
    85.0 percent
    0 references
    1 May 2017
    0 references
    31 December 2018
    0 references
    MUNICIPIO DE PORTALEGRE
    0 references
    0 references

    39°17'48.55"N, 7°19'51.13"W
    0 references
    A operação tem por objecto a construção da ETAR de Reguengo, para tratamento das aguas residuais do aglomerado urbano de Reguengo. Este aglomerado é servido, actualmente, por uma fossa séptica que apresenta diversas deficiências, sendo urgente a sua desactivação. A sua execução contribuirá para a melhoria da qualidade das massas de água da bacia hidrográfica do rio Guadiana. (Portuguese)
    0 references
    The operation is aimed at the construction of the Reguengo treatment plant for the treatment of residual water in the Reguengo urban agglomerate. This cluster is currently served by a septic tank that presents several deficiencies, and its deactivation is urgently needed. Its implementation will contribute to improving the quality of the water bodies of the Guadiana river basin. (English)
    9 July 2021
    0 references
    Portalegre, União das freguesias de Reguengo e São Julião
    0 references

    Identifiers

    POSEUR-03-2012-FC-000294
    0 references