Project of reprofiling Manuel Tomás Street (Q2895355): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles., remove_old_english_translation)
Property / summary
The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles. (English)
 
Property / summary: The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles. (English) / rank
Normal rank
 
Property / summary: The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles. (English) / qualifier
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 07:17, 8 July 2021

Project Q2895355 in Portugal
Language Label Description Also known as
English
Project of reprofiling Manuel Tomás Street
Project Q2895355 in Portugal

    Statements

    0 references
    0 references
    162,846.83 Euro
    0 references
    85.0 percent
    0 references
    1 January 2017
    0 references
    31 December 2017
    0 references
    MUNICIPIO DE GUIMARÃES
    0 references
    0 references

    41°26'34.26"N, 8°18'42.52"W
    0 references
    A dinamização da rua com a definição do traçado da ciclovia de Guimarães passando por este arruamento, implica transformação e requalificação. Ao carro sobrepõe-se agora, a bicicleta e o peão, numa estratégia de partilha e coexistência. Ao arruamento sem passeios e onde o automóvel era dominante, contrapõe-se a circulação de peões e de bicicletas. (Portuguese)
    0 references
    Guimarães, Creixomil
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000024
    0 references