Project of reprofiling Manuel Tomás Street (Q2895355): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles., translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Project of reprofiling Manuel Tomás Street |
Revision as of 07:02, 8 July 2021
Project Q2895355 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Project of reprofiling Manuel Tomás Street |
Project Q2895355 in Portugal |
Statements
162,846.83 Euro
0 references
85.0 percent
0 references
1 January 2017
0 references
31 December 2017
0 references
MUNICIPIO DE GUIMARÃES
0 references
A dinamização da rua com a definição do traçado da ciclovia de Guimarães passando por este arruamento, implica transformação e requalificação. Ao carro sobrepõe-se agora, a bicicleta e o peão, numa estratégia de partilha e coexistência. Ao arruamento sem passeios e onde o automóvel era dominante, contrapõe-se a circulação de peões e de bicicletas. (Portuguese)
0 references
The dynamisation of the street with the definition of the Guimarães bike path through this street implies transformation and requalification. The car now overlaps the bike and the pawn in a strategy of sharing and coexistence. To the street without walks and where the car was dominant, it is opposed to the circulation of pedestrians and bicycles. (English)
8 July 2021
0 references
Guimarães, Creixomil
0 references
Identifiers
NORTE-05-1406-FEDER-000024
0 references