(Created claim: summary (P836): As part of the project, the changeover centre integrating the Bus Station/KP Station and the construction of bicycle roads and associated infrastructure will be expanded and developed. As part of the extension of the transfer centre: — parking type park&ride for approx. 200 parking spaces for passenger cars, – bus bay, – 6 parking spaces for electric passenger vehicles with fast charging stations, – bike & ride parking with 100 covered parking s...) |
||||||||||||||
Property / summary | |||||||||||||||
As part of the project, the changeover centre integrating the Bus Station/KP Station and the construction of bicycle roads and associated infrastructure will be expanded and developed. As part of the extension of the transfer centre: — parking type park&ride for approx. 200 parking spaces for passenger cars, – bus bay, – 6 parking spaces for electric passenger vehicles with fast charging stations, – bike & ride parking with 100 covered parking spaces for bicycles with a charging point for electric bicycles, – maneuvering roads. The construction of 28.2 km of linear cycling infrastructure will include: construction of roads for bicycles of approx. 11.5 km, roads for bicycles and pedestrians with a total length of approx. 6.2 km, belts for bicycles of total length approx. 1.5 km, sections of existing carriageways approx. the total length of approx. 9.0 km (running of bicycles in general traffic, including countertraction) and construction of a walking-bike tunnel with a total length of approx. 146 m. (English) | |||||||||||||||
Property / summary: As part of the project, the changeover centre integrating the Bus Station/KP Station and the construction of bicycle roads and associated infrastructure will be expanded and developed. As part of the extension of the transfer centre: — parking type park&ride for approx. 200 parking spaces for passenger cars, – bus bay, – 6 parking spaces for electric passenger vehicles with fast charging stations, – bike & ride parking with 100 covered parking spaces for bicycles with a charging point for electric bicycles, – maneuvering roads. The construction of 28.2 km of linear cycling infrastructure will include: construction of roads for bicycles of approx. 11.5 km, roads for bicycles and pedestrians with a total length of approx. 6.2 km, belts for bicycles of total length approx. 1.5 km, sections of existing carriageways approx. the total length of approx. 9.0 km (running of bicycles in general traffic, including countertraction) and construction of a walking-bike tunnel with a total length of approx. 146 m. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, the changeover centre integrating the Bus Station/KP Station and the construction of bicycle roads and associated infrastructure will be expanded and developed. As part of the extension of the transfer centre: — parking type park&ride for approx. 200 parking spaces for passenger cars, – bus bay, – 6 parking spaces for electric passenger vehicles with fast charging stations, – bike & ride parking with 100 covered parking spaces for bicycles with a charging point for electric bicycles, – maneuvering roads. The construction of 28.2 km of linear cycling infrastructure will include: construction of roads for bicycles of approx. 11.5 km, roads for bicycles and pedestrians with a total length of approx. 6.2 km, belts for bicycles of total length approx. 1.5 km, sections of existing carriageways approx. the total length of approx. 9.0 km (running of bicycles in general traffic, including countertraction) and construction of a walking-bike tunnel with a total length of approx. 146 m. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 23:34, 7 July 2021
Project Q2713338 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2713338 in Poland |
Statements
48,650,196.09 zloty
0 references
57,235,524.84 zloty
0 references
85.0 percent
0 references
20 December 2018
0 references
30 June 2023
0 references
GMINA TARNOWSKIE GÓRY
0 references
W ramach projektu nastąpi rozbudowa i zagospodarowanie centrum przesiadkowego integrującego Dworzec Autobusowy /Dworzec PKP oraz budowa dróg rowerowych i infrastruktury towarzyszącej. W ramach rozbudowy centrum przesiadkowego powstanie: - parking typu park&ride na ok. 200 miejsc parkingowych dla samochodów osobowych, - zatoka autobusowa, - 6 miejsc postojowych dla pojazdów osobowych o napędzie elektrycznym wraz ze stacjami szybkiego ładowania, - parking typu bike&ride z 100 zadaszonych miejsc postojowych dla rowerów z punktem ładowania rowerów elektrycznych, - jezdnie manewrowe. Budowa 28,2 km liniowej infrastruktury rowerowej obejmie: budowę dróg dla rowerów o długości ok. 11,5 km, dróg dla rowerów i pieszych o łącznej długości ok. 6,2 km, pasów dla rowerów o łącznej długości ok. 1,5 km, odcinków istniejących jezdni ok. łącznej długości ok. 9,0 km (prowadzenie rowerów w ruchu ogólnym, w tym kontraruch) oraz budowę tunelu pieszo-rowerowego o łącznej długości ok. 146 m. (Polish)
0 references
As part of the project, the changeover centre integrating the Bus Station/KP Station and the construction of bicycle roads and associated infrastructure will be expanded and developed. As part of the extension of the transfer centre: — parking type park&ride for approx. 200 parking spaces for passenger cars, – bus bay, – 6 parking spaces for electric passenger vehicles with fast charging stations, – bike & ride parking with 100 covered parking spaces for bicycles with a charging point for electric bicycles, – maneuvering roads. The construction of 28.2 km of linear cycling infrastructure will include: construction of roads for bicycles of approx. 11.5 km, roads for bicycles and pedestrians with a total length of approx. 6.2 km, belts for bicycles of total length approx. 1.5 km, sections of existing carriageways approx. the total length of approx. 9.0 km (running of bicycles in general traffic, including countertraction) and construction of a walking-bike tunnel with a total length of approx. 146 m. (English)
8 July 2021
0 references
Identifiers
RPSL.04.05.01-24-0155/19
0 references