(‎Created claim: summary (P836): The project concerns the extension of the existing pier and the extension of the quay along with securing the slope in Krynica Morska. Passenger Pier – currently has a length of approx. 100 m. After extending the pier by 65.5 m, the width of the entrance to the port will be 38 m, which will result in a reduction of the wavage inside the port, while maintaining the conditions of good navigation on the approach to/out of the port. With the extende...)
Property / summary
 
The project concerns the extension of the existing pier and the extension of the quay along with securing the slope in Krynica Morska. Passenger Pier – currently has a length of approx. 100 m. After extending the pier by 65.5 m, the width of the entrance to the port will be 38 m, which will result in a reduction of the wavage inside the port, while maintaining the conditions of good navigation on the approach to/out of the port. With the extended pier, passenger ships of the White Fleet and units of the Maritime Office in Gdynia can be moored. On the section from the corner of the base of the existing pier towards Gdańska Street, a parking berth with a length of 50.0 m will be extended, which will perform a parking function. Further in the direction of Gdańska Street there will be a strengthening of the eastern shore and a strengthening of the northern shore. In addition, a new pavement of 194 m will be made at the current foot-and-driving route. There will be a parking lot directly behind the exit from Gdańska Street. (English)
Property / summary: The project concerns the extension of the existing pier and the extension of the quay along with securing the slope in Krynica Morska. Passenger Pier – currently has a length of approx. 100 m. After extending the pier by 65.5 m, the width of the entrance to the port will be 38 m, which will result in a reduction of the wavage inside the port, while maintaining the conditions of good navigation on the approach to/out of the port. With the extended pier, passenger ships of the White Fleet and units of the Maritime Office in Gdynia can be moored. On the section from the corner of the base of the existing pier towards Gdańska Street, a parking berth with a length of 50.0 m will be extended, which will perform a parking function. Further in the direction of Gdańska Street there will be a strengthening of the eastern shore and a strengthening of the northern shore. In addition, a new pavement of 194 m will be made at the current foot-and-driving route. There will be a parking lot directly behind the exit from Gdańska Street. (English) / rank
 
Normal rank
Property / summary: The project concerns the extension of the existing pier and the extension of the quay along with securing the slope in Krynica Morska. Passenger Pier – currently has a length of approx. 100 m. After extending the pier by 65.5 m, the width of the entrance to the port will be 38 m, which will result in a reduction of the wavage inside the port, while maintaining the conditions of good navigation on the approach to/out of the port. With the extended pier, passenger ships of the White Fleet and units of the Maritime Office in Gdynia can be moored. On the section from the corner of the base of the existing pier towards Gdańska Street, a parking berth with a length of 50.0 m will be extended, which will perform a parking function. Further in the direction of Gdańska Street there will be a strengthening of the eastern shore and a strengthening of the northern shore. In addition, a new pavement of 194 m will be made at the current foot-and-driving route. There will be a parking lot directly behind the exit from Gdańska Street. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:11, 7 July 2021

Project Q2712551 in Poland
Language Label Description Also known as
English
No label defined
Project Q2712551 in Poland

    Statements

    0 references
    11,238,253.12 zloty
    0 references
    2,498,263.67 Euro
    0.2223 Euro
    0 references
    13,221,474.26 zloty
    0 references
    2,939,133.73 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 July 2020
    0 references
    31 December 2022
    0 references
    DYREKTOR URZĘDU MORSKIEGO W GDYNI
    0 references
    0 references

    54°22'48.0"N, 19°26'36.2"E
    0 references
    Projekt dotyczy rozbudowy istniejącego pirsu oraz wydłużenia nabrzeża wraz z zabezpieczeniem skarpy w Krynicy Morskiej. Pirs Pasażerski–obecnie ma długość ok. 100 m. Po wydłużeniu pirsu o 65,5 m, szerokość wejścia do portu wyniesie 38 m, co skutkować będzie zmniejszeniem falowania wewnątrz portu, przy zachowaniu warunków dobrej nawigacji na podejściu do/wyjściu z portu. Przy przedłużonym pirsie będą mogły cumować statki pasażerskie białej floty i jednostki Urzędu Morskiego w Gdyni. Na odcinku od narożnika nasady istniejącego pirsu w stronę ulicy Gdańskiej wydłużone będzie nabrzeże postojowe o długości 50,0 m, które będzie pełniło funkcję postojową. Dalej w stronę ulicy Gdańskiej wykonane będzie umocnienie brzegu wschodniego oraz umocnienie brzegu północnego. Ponadto w miejscu obecnego ciągu pieszo-jezdnego zostanie wykonana nowa utwardzona nawierzchnia na odcinku 194 m. Bezpośrednio za zjazdem z ulicy Gdańskiej będzie parking. (Polish)
    0 references
    The project concerns the extension of the existing pier and the extension of the quay along with securing the slope in Krynica Morska. Passenger Pier – currently has a length of approx. 100 m. After extending the pier by 65.5 m, the width of the entrance to the port will be 38 m, which will result in a reduction of the wavage inside the port, while maintaining the conditions of good navigation on the approach to/out of the port. With the extended pier, passenger ships of the White Fleet and units of the Maritime Office in Gdynia can be moored. On the section from the corner of the base of the existing pier towards Gdańska Street, a parking berth with a length of 50.0 m will be extended, which will perform a parking function. Further in the direction of Gdańska Street there will be a strengthening of the eastern shore and a strengthening of the northern shore. In addition, a new pavement of 194 m will be made at the current foot-and-driving route. There will be a parking lot directly behind the exit from Gdańska Street. (English)
    8 July 2021