Q2699234 (Q2699234): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project concerns the modernisation (extension and reconstruction) of the existing water treatment plant in Wrocławki in the municipality of Papowo Biskupie. For the project, causal links have been identified between the negative situations in the area of implementation of the project. In particular, the main problem will be addressed through the implementation of the project, the reasons for its creation and its impact. The main problem is t...)
Property / summary
 
The project concerns the modernisation (extension and reconstruction) of the existing water treatment plant in Wrocławki in the municipality of Papowo Biskupie. For the project, causal links have been identified between the negative situations in the area of implementation of the project. In particular, the main problem will be addressed through the implementation of the project, the reasons for its creation and its impact. The main problem is the poor quality of drinking water supplied to residents from the existing water treatment plant. Reasons for the investment:- so far limited financial resources for the implementation of modern water supply solutions,- existing depleted and outdated water treatment infrastructure that does not allow to achieve high quality drinking water. The effect of this is: — poor quality of drinking water – occurrence of so-called hydraulic shocks in the network supplying residents with water leading to the plucking of sediment deposits from pipes,- high water consumption as a result of losses in the filtration process as well as frequent failures in the existing infrastructure and the need for emergency flushing of the network-high energy costsThe above problems resulting in technological, financial and environmental losses justify the need to apply higher standards of solutions for drinking water acquisition for the needs of residents.The scope of the project involves: Preparatory works.- preparation of technical documentation and cost estimation together with geological expertise – development of a feasibility study for the project,- preparation and carrying out of the process of construction of the installation, including the construction of the project; (English)
Property / summary: The project concerns the modernisation (extension and reconstruction) of the existing water treatment plant in Wrocławki in the municipality of Papowo Biskupie. For the project, causal links have been identified between the negative situations in the area of implementation of the project. In particular, the main problem will be addressed through the implementation of the project, the reasons for its creation and its impact. The main problem is the poor quality of drinking water supplied to residents from the existing water treatment plant. Reasons for the investment:- so far limited financial resources for the implementation of modern water supply solutions,- existing depleted and outdated water treatment infrastructure that does not allow to achieve high quality drinking water. The effect of this is: — poor quality of drinking water – occurrence of so-called hydraulic shocks in the network supplying residents with water leading to the plucking of sediment deposits from pipes,- high water consumption as a result of losses in the filtration process as well as frequent failures in the existing infrastructure and the need for emergency flushing of the network-high energy costsThe above problems resulting in technological, financial and environmental losses justify the need to apply higher standards of solutions for drinking water acquisition for the needs of residents.The scope of the project involves: Preparatory works.- preparation of technical documentation and cost estimation together with geological expertise – development of a feasibility study for the project,- preparation and carrying out of the process of construction of the installation, including the construction of the project; (English) / rank
 
Normal rank
Property / summary: The project concerns the modernisation (extension and reconstruction) of the existing water treatment plant in Wrocławki in the municipality of Papowo Biskupie. For the project, causal links have been identified between the negative situations in the area of implementation of the project. In particular, the main problem will be addressed through the implementation of the project, the reasons for its creation and its impact. The main problem is the poor quality of drinking water supplied to residents from the existing water treatment plant. Reasons for the investment:- so far limited financial resources for the implementation of modern water supply solutions,- existing depleted and outdated water treatment infrastructure that does not allow to achieve high quality drinking water. The effect of this is: — poor quality of drinking water – occurrence of so-called hydraulic shocks in the network supplying residents with water leading to the plucking of sediment deposits from pipes,- high water consumption as a result of losses in the filtration process as well as frequent failures in the existing infrastructure and the need for emergency flushing of the network-high energy costsThe above problems resulting in technological, financial and environmental losses justify the need to apply higher standards of solutions for drinking water acquisition for the needs of residents.The scope of the project involves: Preparatory works.- preparation of technical documentation and cost estimation together with geological expertise – development of a feasibility study for the project,- preparation and carrying out of the process of construction of the installation, including the construction of the project; (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:21, 7 July 2021

Project Q2699234 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699234 in Poland

    Statements

    0 references
    1,168,889.54 zloty
    0 references
    259,844.14 Euro
    0.2223 Euro
    0 references
    1,375,164.17 zloty
    0 references
    305,698.99 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    31 December 2021
    0 references
    GMINA PAPOWO BISKUPIE
    0 references
    Q2520053 (Deleted Item)
    0 references

    53°14'58.6"N, 18°33'50.4"E
    0 references
    Projekt dotyczy modernizacji (rozbudowy i przebudowy) istniejącej stacji uzdatniania wody w Wrocławkach w gminie Papowo Biskupie. Dla projektu określono związki przyczynowo-skutkowe pomiędzy sytuacjami negatywnymi, występującymi w obszarze realizacji przedsięwzięcia. W szczególności ukazano problem główny, który rozwiązany zostanie poprzez realizację projektu, przyczyny jego powstania oraz skutki. Problemem głównym jest niska jakość wody pitnej dostarczanej mieszkańcom z istniejącej stacji uzdatniania wody. Przyczyny realizacji inwestycji:- ograniczone dotąd środki finansowe na wdrażanie nowoczesnych rozwiązań zaopatrzenia w wodę,- istniejącą wyeksploatowana i przestarzałą infrastrukturą w zakresie uzdatniania wody nie pozwalająca się na osiągnięcie wysokiej jakości wody pitnej. Skutkiem takiego stanu są: - niska jakość wody pitnej - występowanie w sieci zasilającej mieszkańców w wodę tzw uderzeń hydraulicznych prowadzących do zrywania z rurociagów złogów osadowych,- wysokie zużycie wody w wyniku strat w procesie filtracji a także częstych awarii w dotychczasowej infrastrukturze i konieczności awaryjnego płukania sieci- wysokie koszty energiiPowyższe problemy skutkujące stratami technologicznymi, finansowymi i środowiskowymi uzasadniają potrzebę zastosowania wyższych standardów rozwiązań pozyskiwania wody pitnej na potrzeby mieszkańców.Zakres rzeczowy projektu obejmuje:►Prace przygotowawcze.- przygotowanie dokumentacji technicznej i kosztorysowej wraz z ekspertyzą geologiczną- opracowanie studium wykonalności dla projektu,- przygotowanie i przeprowadzenie postępowania przetargowego►Roboty budowlane- modernizacja budynku suw wraz z dociepleniem oraz wymiana odstojnika wód popłucznych;- przebudowa procesu technologicznego wraz z wymianą niektórych urządzeń i instalacji suw, rurociągów zewnętrznych, renowacją studni głębinowej;- modernizacja urządzeń i instalacji elektrycznych procesu uzdatniania;- zagospodarowanie terenu► Nadzór inwestorski ►Działania promocyjne (Polish)
    0 references
    The project concerns the modernisation (extension and reconstruction) of the existing water treatment plant in Wrocławki in the municipality of Papowo Biskupie. For the project, causal links have been identified between the negative situations in the area of implementation of the project. In particular, the main problem will be addressed through the implementation of the project, the reasons for its creation and its impact. The main problem is the poor quality of drinking water supplied to residents from the existing water treatment plant. Reasons for the investment:- so far limited financial resources for the implementation of modern water supply solutions,- existing depleted and outdated water treatment infrastructure that does not allow to achieve high quality drinking water. The effect of this is: — poor quality of drinking water – occurrence of so-called hydraulic shocks in the network supplying residents with water leading to the plucking of sediment deposits from pipes,- high water consumption as a result of losses in the filtration process as well as frequent failures in the existing infrastructure and the need for emergency flushing of the network-high energy costsThe above problems resulting in technological, financial and environmental losses justify the need to apply higher standards of solutions for drinking water acquisition for the needs of residents.The scope of the project involves: Preparatory works.- preparation of technical documentation and cost estimation together with geological expertise – development of a feasibility study for the project,- preparation and carrying out of the process of construction of the installation, including the construction of the project; (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.04.03.00-04-0010/20
    0 references