Q2822219 (Q2822219): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The project that will be studied will serve areas of the Municipality of Pallini that until now do not have an integrated system of collection and treatment of their waste water. The sewage will be directed for treatment at the Peanias-Koropion Center. The project contributes to compliance with Directive 91/271 EEC. The area under study includes Lower Balana, Labour Houses I and II, Katza, Agios Nikolaos, Labour Houses III, Loutro area and Micha...)
Property / summary
 
The project that will be studied will serve areas of the Municipality of Pallini that until now do not have an integrated system of collection and treatment of their waste water. The sewage will be directed for treatment at the Peanias-Koropion Center. The project contributes to compliance with Directive 91/271 EEC. The area under study includes Lower Balana, Labour Houses I and II, Katza, Agios Nikolaos, Labour Houses III, Loutro area and Michalinos Region. (English)
Property / summary: The project that will be studied will serve areas of the Municipality of Pallini that until now do not have an integrated system of collection and treatment of their waste water. The sewage will be directed for treatment at the Peanias-Koropion Center. The project contributes to compliance with Directive 91/271 EEC. The area under study includes Lower Balana, Labour Houses I and II, Katza, Agios Nikolaos, Labour Houses III, Loutro area and Michalinos Region. (English) / rank
 
Normal rank
Property / summary: The project that will be studied will serve areas of the Municipality of Pallini that until now do not have an integrated system of collection and treatment of their waste water. The sewage will be directed for treatment at the Peanias-Koropion Center. The project contributes to compliance with Directive 91/271 EEC. The area under study includes Lower Balana, Labour Houses I and II, Katza, Agios Nikolaos, Labour Houses III, Loutro area and Michalinos Region. (English) / qualifier
 
point in time: 5 July 2021
Timestamp+2021-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:52, 5 July 2021

Project Q2822219 in Greece
Language Label Description Also known as
English
No label defined
Project Q2822219 in Greece

    Statements

    0 references
    350,119.0 Euro
    0 references
    85.0 percent
    0 references
    6 September 2021
    0 references
    30 December 2022
    0 references
    ΕΥΔΑΠ ΑΕ.
    0 references
    0 references

    38°3'38.27"N, 23°43'46.24"E
    0 references
    Το έργο που θα μελετηθεί πρόκειται να εξυπηρετήσει περιοχές του Δήμου Παλλήνης που μέχρι σήμερα δεν διαθέτουν ολοκληρωμένο σύστημα συλλογής και επεξεργασίας των λυμάτων τους. Τα λύματα θα οδηγούνται προς επεξεργασία στο ΚΕΛ Παιανίας-Κορωπίου. Το έργο συμβάλει στη συμμόρφωση με την οδηγία 91/271 ΕΟΚ, . Η υπό μελέτη περιοχή περιλαμβάνει την Κάτω Μπαλάνα, τις Εργατικές κατοικίες Ι και ΙΙ, την Κάτζα, τον ’γιο Νικόλαο, τις Εργατικές Κατοικίες ΙΙΙ, την περιοχή Λουτρό και την Περιοχή Μιχαληνού. (Greek)
    0 references
    The project that will be studied will serve areas of the Municipality of Pallini that until now do not have an integrated system of collection and treatment of their waste water. The sewage will be directed for treatment at the Peanias-Koropion Center. The project contributes to compliance with Directive 91/271 EEC. The area under study includes Lower Balana, Labour Houses I and II, Katza, Agios Nikolaos, Labour Houses III, Loutro area and Michalinos Region. (English)
    5 July 2021
    0 references

    Identifiers

    5.060.322
    0 references