Revision history of "Change of use of the building after the former primary school in Chamanin with adaptation to dwellings" (Q98734)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 89,626 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:5106:51, 13 October 2024DG Regio talk contribs 89,626 bytes −639 Set a claim value: summary (P836): O objetivo do projeto é alterar a utilização da antiga Escola Primária de Chamanin, adaptando-a às instalações residenciais. O projeto implementado pelo Município de Topólka assume um conjunto abrangente de atividades destinadas a criar 7 habitações sociais, explorando plenamente o potencial do edifício existente da antiga escola. Para o efeito, a execução de:- trabalhos de adaptação abrangentes relacionados com a separação de habitações, vedação e...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 09:5709:57, 26 July 2022DG Regio talk contribs 73,557 bytes +44,005 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 January 2022

16 January 2022

16 December 2021

7 December 2021

1 December 2021

  • curprev 08:2108:21, 1 December 2021DG Regio talk contribs 16,935 bytes +3,088 Created claim: summary (P836): Le projet a pour objet de modifier l’utilisation du bâtiment de l’ancienne école primaire de Chamanin en les adaptant aux locaux résidentiels. Le projet mis en œuvre par la municipalité de Topólka prévoit une gamme complète d’activités visant à créer 7 logements sociaux, en exploitant pleinement le potentiel de la construction existante de l’ancienne école. À cette fin, l’exécution:- des travaux d’adaptation complets liés à la séparation des log...
  • curprev 08:2108:21, 1 December 2021DG Regio talk contribs 13,847 bytes +188 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:2600:26, 16 October 2020DG Regio talk contribs 14,099 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:2600:26, 16 October 2020DG Regio talk contribs 13,937 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:2600:26, 16 October 2020DG Regio talk contribs 14,086 bytes +2,244 Created claim: summary (P836): The subject of the project is to change the use of the former Primary School in Chamanin with adaptation to residential premises. The project implemented by the Topólka Municipality assumes a comprehensive range of activities aimed at creating 7 social housing, fully exploiting the potential of the existing building of the former school. For this purpose, the implementation of:- comprehensive adaptation work related to the separation of dwelling...
  • curprev 00:2600:26, 16 October 2020DG Regio talk contribs 11,842 bytes −1,952 Removed claim: summary (P836): The object of the project is a change in the use of the building of the old Primary School in Channona with adaptive housing. The project carried out by Mr Totlka assumes a comprehensive range of measures to create 7 social housing, making full use of the existing building capacity of the old school. To this end, it is planned to implement the following: complex work of adaptation related to housing, fencing and hardening of dwellings to provi...

23 September 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:3207:32, 6 March 2020DG Regio talk contribs 12,512 bytes +1,952 Created claim: summary (P836): The object of the project is a change in the use of the building of the old Primary School in Channona with adaptive housing. The project carried out by Mr Totlka assumes a comprehensive range of measures to create 7 social housing, making full use of the existing building capacity of the old school. To this end, it is planned to implement the following: complex work of adaptation related to housing, fencing and hardening of dwellings to provide...

24 February 2020

18 February 2020

31 January 2020

14 January 2020