Revision history of "Limiting individual motorised traffic in the city centre by building a bicycle path and rebuilding pedestrian routes along the Avenue of the Polish Army in Strzegom" (Q95792)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:5322:53, 12 October 2024DG Regio talk contribs 86,712 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:5322:53, 12 October 2024DG Regio talk contribs 86,715 bytes −19 Set a claim value: summary (P836): A tarefa abrangida pela proposta é um elemento técnico e funcional separado de um projeto mais vasto no âmbito da documentação técnica e da licença de construção obtidas pelo município. O objeto do pedido é a construção de uma linha de bicicletas a pé ao longo da Avenida do Exército polaco em Strzegom, incluindo: a pé, bem como a construção de iluminação economizadora de energia, um troço de drenagem de águas pluviais, uma baía de autocarros e uma e...

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3120:31, 2 March 2023DG Regio talk contribs 84,340 bytes +863 Changed label, description and/or aliases in da, it, sk, lv, bg, cs, et, el, fr, ga, hu, ro, pt, fi, sv, hr, lt, nl, mt, es, de, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 08:5108:51, 26 July 2022DG Regio talk contribs 81,364 bytes +52,456 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 23:2423:24, 30 November 2021DG Regio talk contribs 17,045 bytes +2,905 Created claim: summary (P836): La tâche proposée est un élément technique et fonctionnel distinct d’un projet plus vaste dans le cadre de la documentation technique et du permis de construire obtenu par la municipalité. L’objet de la proposition est la construction d’un parcours piétonnier-vélo le long de l’avenue de l’armée polonaise à Strzegomi, y compris: à pied, ainsi que la construction d’un éclairage économe en énergie, d’un tronçon d’évacuation de pluie, d’une baie d’a...
  • curprev 23:2423:24, 30 November 2021DG Regio talk contribs 14,140 bytes +263 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 14,317 bytes +224 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 14,093 bytes −237 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 14,330 bytes +2,584 Created claim: summary (P836): The task covered by the proposal is a separate technical and functional element of a wider project within the framework of the technical documentation and construction permit obtained by the municipality. The subject of the application is the construction of a walking-bike line along the Avenue of the Polish Army in Strzegom, including: on foot, as well as the construction of energy-saving lighting, a section of rainwater drainage, a bus bay and...
  • curprev 22:5422:54, 15 October 2020DG Regio talk contribs 11,746 bytes −2,127 Removed claim: summary (P836): The purpose of the proposal is a separate technically and functionally part of a wider project within the framework of the technical documentation and the building permit obtained by the municipality. The object of the proposal is the construction of a pedestrian/bike pipeline along the Alei Wolska Polna in Strzelomiu, including: the cycle of cycling and the construction of the efficient lighting, part of the storm-water system, bus bays and b...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 07:2507:25, 6 March 2020DG Regio talk contribs 12,593 bytes +2,127 Created claim: summary (P836): The purpose of the proposal is a separate technically and functionally part of a wider project within the framework of the technical documentation and the building permit obtained by the municipality. The object of the proposal is the construction of a pedestrian/bike pipeline along the Alei Wolska Polna in Strzelomiu, including: the cycle of cycling and the construction of the efficient lighting, part of the storm-water system, bus bays and bus...

24 February 2020

18 February 2020

31 January 2020

14 January 2020