Revision history of "Reconstruction and retrofitting of the Hospital Rescue Department of the Regional Hospital in Bielsko-Biała in order to improve the conditions for providing medical services and proper segregation in health and life-threatening situations" (Q86347)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 49,499 bytes −7 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 49,506 bytes +9 Set a claim value: summary (P836): Âmbito do projeto: 1) Mudança de utilização do conjunto de garagem para a secção ambulatorial SOR, 2) adição de um segmento de andar único no qual serão localizados consultórios médicos e registo, 3) Reconstrução das instalações existentes SOR, 4) Suplemento de SOR com o equipamento necessário.

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 46,742 bytes +55 Changed label, description and/or aliases in da, it, sk, cs, et, ro, lv, el, hr, ga, fi, de, sv, mt, fr, bg, pt, lt, sl, nl, es, hu, and other parts

24 October 2022

26 July 2022

  • curprev 04:3204:32, 26 July 2022DG Regio talk contribs 45,872 bytes +26,604 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 13,449 bytes +1,173 Created claim: summary (P836): Portée matérielle du projet: 1) Changement d’utilisation de l’assemblage du garage à la partie ambulatoire de l’ESD, 2) construction d’un segment d’un étage, dans lequel les bureaux médicaux et l’enregistrement seront situés, 3) reconstruction des salles existantes du ROS, 4) mise à niveau de l’OS avec l’équipement nécessaire., translated_summary
  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 12,276 bytes +325 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 12,391 bytes +299 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 12,092 bytes −280 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 12,372 bytes +1,096 Created claim: summary (P836): The scope of the project: 1) Change of use of garage assembly to outpatient section SOR, 2) addition of a single-story segment in which medical offices and registration will be located, 3) Reconstruction of existing SOR premises, 4) Supplement of SOR with necessary equipment., translated_summary
  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 11,276 bytes −635 Removed claim: summary (P836): Project scope:(1) Change in the use of the garage team to the ambulatory part of the SOR, (2) a single storey segment hosting the surgeries and the registration, (3) Reconstruction of the existing R & D rooms, (4) the provision of the necessary equipment for SOR., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1710:17, 4 March 2020DG Regio talk contribs 10,200 bytes +635 Created claim: summary (P836): Project scope:(1) Change in the use of the garage team to the ambulatory part of the SOR, (2) a single storey segment hosting the surgeries and the registration, (3) Reconstruction of the existing R & D rooms, (4) the provision of the necessary equipment for SOR., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020