Revision history of "Tworóg-Kędzierzyn gas pipeline" (Q86120)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 54,802 bytes −102 Set a claim value: summary (P836): O projeto tem por objeto a construção do Tworóg – Cortina com diâmetro DN1000 e pressão máxima de funcionamento do nó de transferência de gás de 8,4 MPa da OIT, o nó de transferência de gás de Tworóg com a fechadura universal do pistão de inspeção, juntamente com a infraestrutura que o acompanha, firewalls lineares com sistemas de derivação equipados com coletores para ligar novas estações/recetores (ZZU, Blachownia).

7 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4418:44, 2 March 2023DG Regio talk contribs 49,984 bytes +2,527 Changed label, description and/or aliases in lv, it, da, sk, sl, hr, fi, sv, ga, de, ro, bg, pt, lt, fr, et, hu, es, mt, el, cs, nl, and other parts

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 45,920 bytes +24,312 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 16,831 bytes +1,340 Created claim: summary (P836): L’objet du projet est la construction du gazoduc Tworóg — Kędzierzyn avec diamètre DN1000 et pression maximale de travail MOP 8,4 MPa, le nœud de transmission de gaz Tworóg ainsi que la serrure universelle pour la transmission et la réception du piston d’inspection, ainsi que l’infrastructure d’accompagnement, d’unités de barrage linéaires avec systèmes de dérivation équipés de collecteurs pour le raccordement de nouvelles stations/récepteurs (Z...
  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 15,491 bytes +86 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,845 bytes +91 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,754 bytes −87 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,841 bytes +1,204 Created claim: summary (P836): The subject of the project is the construction of the Tworóg – Curtain with DN1000 diameter and maximum operating pressure of the ILO 8.4 MPa, the Tworóg gas transfer node with the universal lock of the inspection piston, along with the accompanying infrastructure, linear firewalls with bypass systems equipped with collectors to connect new stations/receivers (ZZU, Blachownia)., translated_summary
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,637 bytes −541 Removed claim: summary (P836): The project consists of the construction of a gas pipeline — Kędzierzyn gas pipeline with a diameter of DN1000 and a maximum working pressure of MOP 8,4 MPa, gas hub., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 11,813 bytes +541 Created claim: summary (P836): The project consists of the construction of a gas pipeline — Kędzierzyn gas pipeline with a diameter of DN1000 and a maximum working pressure of MOP 8,4 MPa, gas hub., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020