Revision history of "Integrated Project for the modernisation and development of tram infrastructure in the Śląsko-Zagłębiska Agglomeration with the purchase of tram rolling stock – stage II" (Q86072)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 95,399 bytes +13 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 95,386 bytes +35 Set a claim value: summary (P836): O âmbito do projeto abrange 13 tarefas de infraestruturas (1 relacionadas com a construção de uma nova via e 12 relacionadas com a reconstrução das infraestruturas existentes). Uma descrição pormenorizada do projeto pode ser consultada no capítulo 8 do documento SW – abaixo da parte dispositiva. O projeto inclui, nomeadamente, a construção e modernização de cerca de 23,02 km de linhas de elétrico com cerca de 91 plataformas adaptadas às necessidades...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 91,210 bytes −2,255 Changed label, description and/or aliases in it, da, sk, el, sv, bg, hu, fi, de, fr, lv, ro, cs, et, ga, pt, nl, sl, lt, es, mt, hr, and other parts

24 October 2022

13 August 2022

  • curprev 17:2717:27, 13 August 2022DG Regio talk contribs 90,871 bytes +56,572 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 22,751 bytes +2,843 Created claim: summary (P836): Le projet couvre 13 tâches d’infrastructure (1 liées à la construction d’une nouvelle voie et 12 liées à la reconstruction des infrastructures existantes). Une description détaillée du projet se trouve au chapitre 8 du SW — ci-dessous le dispositif. Le projet comprend la construction et la modernisation d’env. 23,02 km de lignes de tramway avec adaptation d’env. 91 plateformes pour les personnes handicapées. Ventilation des coûts du projet en di...
  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 19,908 bytes +257 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 20,091 bytes +235 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 19,856 bytes −226 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 20,082 bytes +2,807 Created claim: summary (P836): The scope of the project covers 13 infrastructure tasks (1 related to the construction of a new track and 12 related to the reconstruction of existing infrastructure). A detailed description of the project can be found in Chapter 8 of the SW – below operative part. The project includes, among others, the construction and modernisation of approx. 23.02 km of tram lines with adjustment approx. 91 platforms for the needs of people with disabilities...
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 17,275 bytes −2,216 Removed claim: summary (P836): The scope of the project consists of 13 infrastructure tasks (1 for the construction of a new track and 12 related to the construction of the existing infrastructure).For a detailed description of the project, see chapter 8 of the STC below the operative part.The project includes, but is not limited to, construction and modernisation of around23.02 km of tram line with adjustment91 platforms for people with disabilities.Breakdown of project co...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 15,708 bytes +2,216 Created claim: summary (P836): The scope of the project consists of 13 infrastructure tasks (1 for the construction of a new track and 12 related to the construction of the existing infrastructure).For a detailed description of the project, see chapter 8 of the STC below the operative part.The project includes, but is not limited to, construction and modernisation of around23.02 km of tram line with adjustment91 platforms for people with disabilities.Breakdown of project cost...

18 February 2020

8 February 2020

31 January 2020

14 January 2020