Revision history of "Improving safety through the construction of new rail switches with a higher standard of construction – stage II" (Q86039)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 98,592 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 98,594 bytes −280 Set a claim value: summary (P836): O objeto do projeto POIiŚ 5.2-20 «Melhoria da segurança através da construção de novos comutadores ferroviários com um nível de construção mais elevado – fase II» visa melhorar a segurança dos comboios e garantir uma maior qualidade dos serviços de transporte em linhas de alta velocidade e velocidades iguais ou superiores a 80 km/h. A tarefa inclui a substituição de 244 comutadores (incluindo robôs acompanhantes). A execução do projecto permitirá at...

20 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 88,177 bytes +5,828 Changed label, description and/or aliases in fr, lv, ro, da, it, et, sk, lt, de, sv, bg, cs, es, hr, fi, hu, sl, pt, ga, nl, el, mt, and other parts

24 October 2022

27 September 2022

13 August 2022

  • curprev 17:2717:27, 13 August 2022DG Regio talk contribs 77,784 bytes +41,217 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 26,412 bytes +2,436 Created claim: summary (P836): Le projet OPI & E 5.2-20 «Améliorer la sécurité en construisant de nouveaux aiguillages ferroviaires d’une norme de conception accrue — phase II» vise à améliorer la sécurité du trafic ferroviaire et à fournir une meilleure qualité des services de transport sur des lignes caractérisées par des volumes de trafic et des vitesses élevés égales ou supérieures à 80 km/h. La tâche comprend le remplacement de 244 branchements (y compris les robots d’ac...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 23,976 bytes +198 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 24,218 bytes +174 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 24,044 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 24,206 bytes +2,037 Created claim: summary (P836): The subject of the POIiŚ project 5.2-20 “Improving safety through the construction of new rail switches with a higher standard of construction – stage II” is aimed at improving the safety of trains and ensuring a higher quality of transport services on high-speed lines and speeds equal to or greater than 80 km/h. The task includes the replacement of 244 switches (including accompanying robots). The implementation of the project will achieve the...
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 22,169 bytes −1,681 Removed claim: summary (P836): The OPI & E project 5.2-20 “Improving safety through the construction of new rail switches of a higher design standard — Phase II” is to improve train traffic safety and to ensure higher quality of transport services on lines with high traffic volumes and speed equal to or below 80 km/h. the task includes the replacement of 244 crossings (with accompanying works).The project will achieve the following objectives:• the improvement of railway tr...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 17,585 bytes +1,681 Created claim: summary (P836): The OPI & E project 5.2-20 “Improving safety through the construction of new rail switches of a higher design standard — Phase II” is to improve train traffic safety and to ensure higher quality of transport services on lines with high traffic volumes and speed equal to or below 80 km/h. the task includes the replacement of 244 crossings (with accompanying works).The project will achieve the following objectives:• the improvement of railway traf...

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)