Revision history of "Works on railway line No. 1 on the Częstochowa-Zawiercie section" (Q86036)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 76,819 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 76,822 bytes −27 Set a claim value: summary (P836): Projecto no âmbito da linha ferroviária 1(odc. Czestochowa – Zawiercie, do km 229,350 ao 273,265). O comprimento do troço é de 43,915 km. A execução do projeto pressupõe uma reabilitação alargada, a fim de restabelecer os parâmetros técnicos e operacionais originais e atingir velocidades de 160 km/h (comboios de passageiros) e 120 km/h (mercadoria), carga admissível de 221 kN/eixo. O desenvolvimento de projetos de construção e execução para a secção...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 74,513 bytes +639 Changed label, description and/or aliases in da, lv, it, sk, bg, cs, fr, fi, pt, hu, mt, ro, hr, ga, sv, lt, et, el, nl, sl, de, es, and other parts

24 October 2022

27 September 2022

13 August 2022

  • curprev 17:2717:27, 13 August 2022DG Regio talk contribs 72,343 bytes +44,394 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 18,275 bytes +2,453 Created claim: summary (P836): Projet sur la ligne de chemin de fer no 1 (odc. Czestochowa — Zawiercie du km 229,350 à 273,265). La longueur de la section est de 43,915 km. La mise en œuvre du projet implique la réalisation d’une réhabilitation prolongée afin de rétablir les paramètres techniques et opérationnels d’origine ainsi que des vitesses d’accès de 160 km/h (trains de voyageurs) et de 120 km/h (fret), une charge admissible de 221 kN par essieu. Le développement des pr...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 15,822 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 16,142 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 16,018 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 16,120 bytes +2,215 Created claim: summary (P836): Project within the railway line 1(odc. Czestochowa – Zawiercie from km 229.350 to 273.265). The length of the section is 43.915 km. Implementation of the Project assumes extended rehabilitation in order to restore the original technical and operational parameters and reach speeds of 160 km/h (passenger trains) and 120 km/h (commodity), permissible load of 221 kN/axle. The development of construction and execution projects for the Częstochowa-Zaw...
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 13,905 bytes −1,890 Removed claim: summary (P836): Project within the railway line No 1 (dec.Częstochowa — Zawiercie from km 229,350 to 273,265The length of the section is 43.915 km.Implementation of the project involves the provision of extended rehabilitation in order to re-establish the initial technical and operational parameters and achieve a speed of 160 km/h (passenger trains) and 120 km/h (freight), the target of 221 kN/axle.The construction and implementation of the construction and i...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 13,255 bytes +1,890 Created claim: summary (P836): Project within the railway line No 1 (dec.Częstochowa — Zawiercie from km 229,350 to 273,265The length of the section is 43.915 km.Implementation of the project involves the provision of extended rehabilitation in order to re-establish the initial technical and operational parameters and achieve a speed of 160 km/h (passenger trains) and 120 km/h (freight), the target of 221 kN/axle.The construction and implementation of the construction and imp...

18 February 2020

8 February 2020

31 January 2020

14 January 2020