Revision history of "Modernisation of selected stations on railway line No. 1 on the section Skierniewice – Częstochowa, Gałkówek station on lines 17 and 25." (Q86006)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 63,393 bytes −33 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 63,426 bytes −472 Set a claim value: summary (P836): O âmbito dos trabalhos deve incluir: — construção ou renovação e modernização de 9 instalações existentes de dois andares abrangidas pelo âmbito do projeto, — execução de trabalhos de acabamento de interiores e exteriores em conformidade com a especificação pormenorizada desenvolvida para cada um dos dois, — adaptação de objetos às necessidades das pessoas com deficiência em conformidade com as orientações da ETI-PRM, — desenvolvimento de áreas em t...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 13:1113:11, 2 March 2023DG Regio talk contribs 61,924 bytes +7,918 Changed label, description and/or aliases in fr, it, da, bg, sk, cs, et, ga, fi, pt, es, el, de, mt, nl, hr, lt, sl, hu, lv, ro, sv, and other parts

24 October 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 52,875 bytes +29,307 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 15,516 bytes +1,856 Created claim: summary (P836): La portée des travaux comprend: — construction ou reconstruction et modernisation de bâtiments existants 9 d relevant du projet, — réalisation de travaux de finition intérieure et extérieure conformément au cahier des charges détaillé établi pour chacun des deux, — adaptation des installations aux besoins des personnes handicapées conformément aux lignes directrices STI-PRM, — aménagement de zones autour de deux, comprenant, entre autres, le rem...
  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 13,660 bytes +214 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 13,886 bytes +201 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 13,685 bytes −198 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 13,883 bytes +1,336 Created claim: summary (P836): The scope of work shall include: — construction or refurbishment and modernisation of existing 9 two-storey facilities falling within the scope of the project, – execution of finishing works of interiors and outdoors in accordance with the detailed specification developed for each of the two, – adaptation of objects to the needs of disabled persons in accordance with the TSI-PRM guidelines, – the development of areas around two. The scope of wor...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,547 bytes −1,259 Removed claim: summary (P836): This work comprises:Construction or upgrading and upgrading of existing plants of 9 two within the scope of the project — completion of interior and outdoor completion of buildings in accordance with the detailed specifications developed for each of them., — adaptation of facilities to the needs of disabled persons in accordance with the TSI-PRM guidelines, — land management around the two areas including inter alia replacement of the surface,...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 11,681 bytes +1,259 Created claim: summary (P836): This work comprises:Construction or upgrading and upgrading of existing plants of 9 two within the scope of the project — completion of interior and outdoor completion of buildings in accordance with the detailed specifications developed for each of them., — adaptation of facilities to the needs of disabled persons in accordance with the TSI-PRM guidelines, — land management around the two areas including inter alia replacement of the surface, p...

18 February 2020

8 February 2020

31 January 2020

14 January 2020