Revision history of "Works on railway line No. 8, section Warka – Radom (Lot C, D, E)" (Q85999)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 81,986 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 81,989 bytes −377 Set a claim value: summary (P836): O projeto tem por objeto a modernização da linha ferroviária n.o 8 no troço Warka – Radom (LOT C, D, E), do km 58,100 ao km 100,850. Os robôs foram divididos em três episódios: —LOT C do km 58.100 ao km 63.400, -LOT D do km 63.400 ao km 85.500, -LOT E do km 85.500 ao km 100.850, incluindo: • construção da segunda via no troço Warka – Radom e reconstrução da ponte existente sobre o rio Pilica, • modernização global da infraestrutura, a fim de aumenta...

22 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 78,167 bytes +5,962 Changed label, description and/or aliases in da, sk, fi, cs, lv, de, ga, sv, el, bg, sl, pt, ro, et, fr, lt, nl, hu, hr, es, mt, and other parts

24 October 2022

27 September 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 69,965 bytes +38,971 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 22,597 bytes +2,394 Created claim: summary (P836): L’objet du projet est la modernisation de la ligne de chemin de fer no 8 sur le tronçon Warka — Radom (LOT C, D, E), du km 58.100 au km 100,850. Les robots ont été divisés en trois épisodes: —Lot C du km 58100 au km 63400, -LOT D du km 63400 au km 85500, -LOT E du km 85500 au km 100 850, et comprend entre autres: • construction de la deuxième voie sur le tronçon Warka — Radom et reconstruction du pont existant au-dessus de la rivière Pilica, • m...
  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 20,203 bytes +140 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 20,503 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 20,378 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 20,498 bytes +1,993 Created claim: summary (P836): The subject of the Project is the modernisation of the railway line No. 8 on the Warka – Radom section (LOT C, D, E), from km 58.100 to km 100.850. The robots were divided into three episodes: —LOT C from km 58.100 to km 63.400, -LOT D from km 63.400 to km 85.500, -LOT E from km 85.500 to km 100.850, including: • construction of the second track on the Warka – Radom section and reconstruction of the existing bridge over the Pilica river, • compr...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 18,505 bytes −1,792 Removed claim: summary (P836): The subject of the Project is the modernisation of railway line No 8 on section Warka — Radom (LOT C, D, E) from km 58,100 to km 100,850.The works were divided into three sections:— LOT C from km 58,100 to km 63,400, -LOT D from km 63,400 to km 85,500, -LOT E from km 85,500 to km 100,850, including:• the construction of a second track on the section of Warka — Radom and the reconstruction of the existing bridge over the river Pilica,• a compre...

23 September 2020

15 July 2020

22 June 2020

16 June 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)