Revision history of "Modernisation of the Warsaw – Łódź railway line, stage II, Lot C – other works, FAZA II" (Q85985)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 96,439 bytes +1 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 96,438 bytes +22 Set a claim value: summary (P836): O projeto inclui a construção da camada LCS na linha 1 entre a estação de Żyrard, em km, aproximadamente 44 000, e a estação de Koluszki, em km, cerca de 103 000, destinada a permitir o controlo do referido troço da linha ferroviária no centro de controlo local localizado na estação de Skierniewice, obras de alteração do traçado da estação de Skierniewice (linhas 11, 12, 529 e 530) e a adição das linhas 1 e 17 ao sistema ERTMS, bem como a construção...

22 March 2024

15 January 2024

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 90,715 bytes −288 Changed label, description and/or aliases in da, it, sk, es, lt, sv, cs, bg, fi, de, ga, hr, el, et, lv, pt, ro, fr, nl, hu, sl, mt, and other parts

26 January 2023

25 January 2023

24 October 2022

27 September 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 88,320 bytes +55,146 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 20,953 bytes +3,050 Created claim: summary (P836): Le projet comprend la construction de la couche LCS sur la ligne 1 entre la gare de la gare de Žyrardów en km environ. 44 000 et la gare Koluszki en km environ 103 000 pour permettre le contrôle du tronçon susmentionné de la ligne de chemin de fer à l’intérieur du centre de contrôle local situé à la gare de Skierniewice, des travaux de modification de l’aménagement de la voie de la gare de Skierniewice (lignes 11, 12, 529 et 530) et la modernisa...
  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 17,903 bytes +161 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 18,182 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 18,029 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 18,181 bytes +2,840 Created claim: summary (P836): The project includes the construction of the LCS layer on line 1 between the Żyrard station in km approx. 44.000 and Koluszki station in km about 103.000 aimed at enabling the above-mentioned section of the railway line to be controlled within the Local Control Centre located at Skierniewice station, works on changes in the track layout of Skierniewice station (lines 11, 12, 529 and 530) and the addition of line 1 and line 17 to ERTMS system, as...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 15,341 bytes −2,311 Removed claim: summary (P836): The project covers the construction of the LCS layer on line No 1 between the Żyrardów station, at km.44,000 a Koluszki station, at km approximately 103,000, in order to enable the control of the section of the railway line within the local control centre situated at the station of Skierniewice, works on alterations to the track system of Skierniewice (lines 11, 12, 529 and 530) and the retrofitting of lines 1 and line 17 with the ERTMS system...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 14,696 bytes +2,311 Created claim: summary (P836): The project covers the construction of the LCS layer on line No 1 between the Żyrardów station, at km.44,000 a Koluszki station, at km approximately 103,000, in order to enable the control of the section of the railway line within the local control centre situated at the station of Skierniewice, works on alterations to the track system of Skierniewice (lines 11, 12, 529 and 530) and the retrofitting of lines 1 and line 17 with the ERTMS system,...

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)