Revision history of "Construction of the Olsztyn ring road within Dk No. 16" (Q85937)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 79,868 bytes +8 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 79,860 bytes +16 Set a claim value: summary (P836): Este projeto abrange a construção da estrada circular de Olsztyn num raio de 10 000 km das aldeias de Olsztyn, onde a estrada da classe GP vai do km 0 + 000 ao km 8 + 240, e a estrada S do km 8 + 240 ao km 10 + 000 e está totalmente localizada numa rede global de RTE-T 132 + 220 na área de Kudypa, a oeste de Olsztyn. A extremidade está localizada na intersecção com a S51 projetada no lado leste no km projetado 10+ 000. O bypass planejado foi projeta...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3720:37, 2 March 2023DG Regio talk contribs 78,590 bytes −1,992 Changed label, description and/or aliases in it, da, lv, sk, cs, el, hu, ga, fr, et, lt, ro, nl, hr, pt, sv, mt, sl, de, fi, bg, es, and other parts

24 October 2022

26 July 2022

  • curprev 04:1804:18, 26 July 2022DG Regio talk contribs 79,779 bytes +49,512 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 18,069 bytes +3,103 Created claim: summary (P836): Ce projet couvre la construction d’un contournement d’Olsztyn d’une longueur de 10 000 km à l’intérieur de la dk no 16 et de la S51, où la route de classe GP va du km 0+ 000 au km 8+ 240, et la route S du km 8 + 240 au km 10+ 000 et entièrement située dans le réseau global du RTE-T. Ce contournement conçu comme un contournement de la ville et de la commune d’Olsztyn suit une nouvelle voie de l’ouest au sud sur les paramètres techniques — utilita...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 14,966 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 15,276 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 15,163 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 15,272 bytes +2,569 Created claim: summary (P836): This project covers the construction of the Olsztyn ring road within 10.000 km length of the villages of Olsztyn, where the GP class road runs from km 0 + 000 to km 8+ 240, and the S road from km 8 + 240 to km 10+ 000 and is entirely located in a comprehensive network of TEN-T. 132+ 220 in the area of Kudypa to the west of Olsztyn. The end is located at the intersection with the designed S51 on the east side in the designed km 10+ 000. The plann...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,703 bytes −2,325 Removed claim: summary (P836): This project involves the construction of a bypass of Olsztyn in 16 and S51 of 10.000 km in length, where the road class GP runs from km 0 + 000 to km 8 + 240 and the road S from km 8 + 240 to km 10 + 000 and is located in its entirety on the TEN-T comprehensive network. this bypass designed to bypass the city and the municipality of Olsztyn runs a new trace from the west to south on the technical and service parameters ‘GP’ and ‘S’ Starting t...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 13,310 bytes +2,325 Created claim: summary (P836): This project involves the construction of a bypass of Olsztyn in 16 and S51 of 10.000 km in length, where the road class GP runs from km 0 + 000 to km 8 + 240 and the road S from km 8 + 240 to km 10 + 000 and is located in its entirety on the TEN-T comprehensive network. this bypass designed to bypass the city and the municipality of Olsztyn runs a new trace from the west to south on the technical and service parameters ‘GP’ and ‘S’ Starting the...

18 February 2020

8 February 2020

31 January 2020

14 January 2020