Revision history of "Construction of the S5 expressway. Nowy Marzy – Bydgoszcz" (Q85936)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 78,337 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 78,339 bytes +24 Set a claim value: summary (P836): O projecto consiste na construção da via rápida S5 em PC. Nowy Marzy – Bydgoszcz com comprimento total. 73,84 km, localizado na parte centro-norte da Polónia e passando pela Voivodia da Cujávia-Pomerânia. Esta secção está localizada na rede global da RTE-T. Em resultado do projeto em 2019, será alcançado o indicador de realizações – construção de 73,84 km de novas estradas. O projeto é composto por 4 secções (contratos): 1: Conceção e construção da...

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 21:5021:50, 2 March 2023DG Regio talk contribs 75,559 bytes −1,035 Changed label, description and/or aliases in da, it, sk, fr, nl, fi, el, ga, et, pt, sl, es, ro, lt, sv, de, cs, mt, hu, bg, hr, lv, and other parts

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 75,413 bytes +46,966 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 17,581 bytes +2,392 Created claim: summary (P836): Le projet consiste en la construction de la voie express S5 sur l’odc. Nouveaux rêves — Bydgoszcz longueur totale 73,84 km, situé dans le centre-nord de la Pologne et passant par la voïvodie de Kujawsko-Pomorskie. Cette section est située dans le réseau global RTE-T. Grâce à la mise en œuvre du projet en 2019, l’indicateur de réalisation — la construction de 73,84 km de nouvelles routes sera atteint. Le projet se compose de 4 sections (contrats)...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 15,189 bytes +126 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 15,503 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 15,385 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 15,504 bytes +2,423 Created claim: summary (P836): The project consists of the construction of the S5 expressway on pc. Nowy Marzy – Bydgoszcz with total length. 73.84 km, located in the north-central part of Poland and passing through the Kujawsko-Pomorskie Voivodeship. This section is located in the TEN-T comprehensive network. As a result of the project in 2019, the output indicator – construction of 73.84 km of new roads will be achieved. The project consists of 4 sections (contracts): 1: De...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 13,081 bytes −2,060 Removed claim: summary (P836): The project consists of the construction of the S5 express road.New Marzy — Bydgoszcz, with a total length73.84 km, located in the north-central part of Poland and passing through the region of Kujawsko-Pomorskie Province.The section is located in the TEN-T comprehensive network and a product indicator will be reached as a result of the implementation of the project in 2019 — construction of 73.84 km of new roads.The project consists of 4 sect...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 13,008 bytes +2,060 Created claim: summary (P836): The project consists of the construction of the S5 express road.New Marzy — Bydgoszcz, with a total length73.84 km, located in the north-central part of Poland and passing through the region of Kujawsko-Pomorskie Province.The section is located in the TEN-T comprehensive network and a product indicator will be reached as a result of the implementation of the project in 2019 — construction of 73.84 km of new roads.The project consists of 4 sectio...

18 February 2020

8 February 2020

31 January 2020

14 January 2020