Revision history of "“Construction of the Ostróda ring road within dk 16”" (Q85927)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 86,866 bytes +15 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 86,851 bytes +10 Set a claim value: summary (P836): O projeto visa a construção da circunvalação de Ostróda com um comprimento de 10,84 km e de um troço transitório da estrada nacional n.o 16 (no lado oriental do entroncamento «Ostród Południe»), com um comprimento de 0,43 km, que inclui a circunvalação de Ostróda na atual DK16. Serão construídos 11,27 km de novas estradas. O projeto na fase de preparação, concurso e obras de construção foi dividido em duas partes: 1. construção da circunvalação de O...

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 84,808 bytes −477 Changed label, description and/or aliases in it, da, sk, ga, et, fi, hr, el, de, bg, fr, lv, sv, pt, es, cs, nl, ro, hu, lt, sl, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:1804:18, 26 July 2022DG Regio talk contribs 84,463 bytes +53,386 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 18,950 bytes +3,044 Created claim: summary (P836): Le projet vise la construction d’un périphérique d’Ostróda d’une longueur de 10,84 km et d’un tronçon de la route nationale no 16 (du côté est de la jonction Ostród Południe) d’une longueur de 0,43 km, ce qui constitue l’inclusion du périphérique Ostróda dans la DK16 existante. Un total de 11,27 km de nouvelles routes seront construits. Le projet au stade de la préparation, de l’appel d’offres et des travaux de construction était divisé en deux...
  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 15,906 bytes +129 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 16,217 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 16,101 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 16,223 bytes +2,757 Created claim: summary (P836): The project aims at the construction of the Ostróda ring road with a length of 10.84 km and a transitional section of national road No 16 (on the eastern side of the “Ostród Południe” junction), with a length of 0.43 km, which includes the Ostróda ring road in the existing DK16. A total of 11.27 km of new roads will be built. The project at the stage of preparation, tender and construction works was divided into two parts: 1. construction of the...
  • curprev 14:5414:54, 14 October 2020DG Regio talk contribs 13,466 bytes −2,344 Removed claim: summary (P836): The project aims at the construction of a 10.84 km long route of the Ostóda bypass and of a section of the transition section of national road No 16 (on the eastern side of the ‘Ostón South’ node), the length of which is 0.43 km, which will include the Ostóda bypass in the existing DK16.In total, 11.27 km of new roads will be built.The project was divided into two parts in the preparation, tendering and construction phases:1. construction of t...

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 13,298 bytes +2,344 Created claim: summary (P836): The project aims at the construction of a 10.84 km long route of the Ostóda bypass and of a section of the transition section of national road No 16 (on the eastern side of the ‘Ostón South’ node), the length of which is 0.43 km, which will include the Ostóda bypass in the existing DK16.In total, 11.27 km of new roads will be built.The project was divided into two parts in the preparation, tendering and construction phases:1. construction of the...

18 February 2020

8 February 2020

31 January 2020

14 January 2020