Revision history of "Supplementing the water supply and drainage system and improving the energy efficiency of Zakłady Wodociągów i Kanalizacji Sp. z o.o. in Gorzów Wlkp." (Q85423)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 62,545 bytes −22 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 62,567 bytes +16 Set a claim value: summary (P836): O projeto inclui a modernização da estação de tratamento de águas residuais de Gorzów Wlkp no domínio da melhoria da eficiência energética (troca de sopradores tecnológicos), bem como a instalação de equipamento de medição e a extensão do expedidor central. Além disso, a construção de uma rede de esgotos com um comprimento total de 9,85 km e a reconstrução da rede existente com um comprimento total de 10,56 km serão realizadas na cidade de Gorzów Wl...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:5318:53, 2 March 2023DG Regio talk contribs 58,659 bytes +641 Changed label, description and/or aliases in it, da, sk, fi, ro, pt, hu, et, fr, el, sl, ga, sv, lt, cs, mt, hr, nl, bg, de, es, lv, and other parts

21 October 2022

26 July 2022

  • curprev 04:0804:08, 26 July 2022DG Regio talk contribs 56,844 bytes +33,828 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 15,725 bytes +1,775 Created claim: summary (P836): Le projet comprend la modernisation de l’usine de traitement des eaux usées de Gorzów Wlkp. dans le domaine de l’amélioration de l’efficacité énergétique (remplacement des souffleuses technologiques) et l’installation de dispositifs de mesure et l’agrandissement de la salle centrale de distribution. En outre, la construction d’un réseau d’assainissement d’une longueur totale de 9,85 km et la reconstruction du réseau existant d’une longueur total...
  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 13,950 bytes +262 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 14,128 bytes +213 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 13,915 bytes −230 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 14,145 bytes +1,602 Created claim: summary (P836): The project includes modernisation of the sewage treatment plant in Gorzów Wlkp in the field of energy efficiency improvement (technology blower exchange) as well as installation of measuring equipment and extension of the Central dispatcher. In addition, the construction of a sewerage network with a total length of 9.85 km and reconstruction of the existing network with a total length of 10.56 km will be carried out in the city of Gorzów Wlkp a...
  • curprev 15:5815:58, 14 October 2020DG Regio talk contribs 12,543 bytes −1,210 Removed claim: summary (P836): The project involves the modernisation of the wastewater treatment plant in Gorzów Wielkopolski for improving energy efficiency (the replacement of technological blowers) and the installation of measuring equipment and the extension of the central control room.In addition, the construction of a sewerage network with a total length of 9.85 km will be carried out and the existing network to be rebuilt with a total length of 10.56 km in Gorzów Wl...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1310:13, 4 March 2020DG Regio talk contribs 11,622 bytes +1,210 Created claim: summary (P836): The project involves the modernisation of the wastewater treatment plant in Gorzów Wielkopolski for improving energy efficiency (the replacement of technological blowers) and the installation of measuring equipment and the extension of the central control room.In addition, the construction of a sewerage network with a total length of 9.85 km will be carried out and the existing network to be rebuilt with a total length of 10.56 km in Gorzów Wlkp...

18 February 2020

8 February 2020

31 January 2020

14 January 2020