Revision history of "Modernisation and construction of sewage and water supply networks of Świnoujście – stage II and modernisation of sewage treatment plants" (Q85369)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 53,396 bytes −9 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 53,405 bytes +13 Set a claim value: summary (P836): O projeto inclui a construção de 1,54 km de sistema de esgotos sanitários, a construção de 0,8 km e a reconstrução de 0,83 km de rede de abastecimento de água, a modernização da estação de tratamento de esgotos em Świnoujście no âmbito da gestão de sedimentos, a adaptação do sistema SIG usado, a aquisição de um carro de alta pressão para a limpeza do sistema de esgotos sanitários, a aquisição de uma câmara móvel para monitorizar a rede de esgotos e...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3922:39, 2 March 2023DG Regio talk contribs 50,222 bytes −147 Changed label, description and/or aliases in lv, da, it, bg, sk, hu, fr, pt, cs, fi, ro, el, ga, mt, et, es, de, lt, hr, sv, nl, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2117:21, 13 August 2022DG Regio talk contribs 48,256 bytes +29,074 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 12,875 bytes +1,432 Created claim: summary (P836): Le projet comprend la construction de 1,54 km d’égouts sanitaires, la construction de 0,8 km et la reconstruction de 0,83 km du réseau d’approvisionnement en eau, la modernisation de la station d’épuration des eaux usées de Świnoujście dans le domaine de la gestion des boues, la modernisation du système SIG utilisé, l’achat d’une voiture à haute pression pour le nettoyage du réseau d’assainissement, l’achat d’une caméra mobile pour la surveillan...
  • curprev 20:5520:55, 30 November 2021DG Regio talk contribs 11,443 bytes +256 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 11,627 bytes +201 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 11,426 bytes −226 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 11,652 bytes +1,306 Created claim: summary (P836): The project includes the construction of 1.54 km of sanitary sewage system, construction of 0.8 km and reconstruction of 0.83 km of water supply network, modernisation of sewage treatment plant in Świnoujście in the scope of sediment management, retrofitting of the used GIS system, purchase of a high-pressure car for sanitary sewage system cleaning, purchase of a mobile camera for monitoring sewage network and purchase of a car with HDS from ope...
  • curprev 15:5415:54, 14 October 2020DG Regio talk contribs 10,346 bytes −889 Removed claim: summary (P836): The project involves the construction of 1.54 km of sanitary sewerage, the construction of 0.8 km and the reconstruction of 0.83 km of water supply, the modernisation of the wastewater treatment plant in Świnoujście in the area of sludge management, the retrofitting of the system operated by the GIS, the purchase of a high pressure vehicle for cleaning the sewage system, the purchase of a mobile camera to monitor the sewerage network and the p...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1010:10, 4 March 2020DG Regio talk contribs 9,962 bytes +889 Created claim: summary (P836): The project involves the construction of 1.54 km of sanitary sewerage, the construction of 0.8 km and the reconstruction of 0.83 km of water supply, the modernisation of the wastewater treatment plant in Świnoujście in the area of sludge management, the retrofitting of the system operated by the GIS, the purchase of a high pressure vehicle for cleaning the sewage system, the purchase of a mobile camera to monitor the sewerage network and the pur...

18 February 2020

8 February 2020

31 January 2020

14 January 2020