Revision history of "Ordering waste water management in the Pleshevo Agglomeration" (Q85259)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 49,500 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 49,502 bytes +38 Set a claim value: summary (P836): O escopo do trabalho no projeto inclui: — construção de um sistema de esgotos sanitários: 13,06 km – distribuição da rede geral de deriva: 0,48 km, – construção de um sistema de esgotos de águas pluviais: 0,32 km – reconstrução da rede de abastecimento de água: 0,84 km, – aquisição de uma máquina comum reciclável de 3 eixos: 1 unidade — modernização das estações de tratamento de água — 1 unidade. O número previsto de RLM ligados no âmbito do projeto...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 46,294 bytes −1,070 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, ro, es, lt, pt, hu, nl, ga, sl, sv, el, de, mt, fi, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0504:05, 26 July 2022DG Regio talk contribs 45,256 bytes +26,985 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,504 bytes +1,354 Created claim: summary (P836): La portée des travaux du projet comprend: — construction d’un réseau d’assainissement sanitaire: 13,06 km — dégroupage du réseau général: 0,48 km, — construction d’un réseau d’assainissement des eaux pluviales: 0,32 km — reconstruction du réseau d’approvisionnement en eau: 0,84 km, — achat d’une machine municipale à 3 axes avec recyclage: 1 pcs. — modernisation des stations de traitement de l’eau — 1 pcs. Le nombre prévu d’E.E. connectés au proj...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,150 bytes +130 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,460 bytes +120 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,340 bytes −104 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 11,444 bytes +1,290 Created claim: summary (P836): The scope of work in the project includes: — construction of sanitary sewage system: 13,06 km – distribution of the general drift network: 0.48 km, – construction of a rainwater sewer system: 0.32 km – reconstruction of the water supply network: 0,84 km, – purchase of a 3-axis recyclable communal machine: 1 pcs — modernisation of water treatment stations – 1 pcs. The planned number of RLM connected within the project is 930 RLM of individual cus...
  • curprev 15:1715:17, 14 October 2020DG Regio talk contribs 10,154 bytes −832 Removed claim: summary (P836): The scope of work in the project includes:— construction of a sewerage network:13.06 km — Chapter of the combined network:0.48 km, construction of storm-water drainage network:0.32 km — reconstruction of water supply system:0.84 km — purchase of 3-axial municipal machine for recycling:1 unitsModernisation of the water treatment plant — 1.The planned number of population equivalents connected to the project is 930 p.e. of individual consumers.,...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,711 bytes +832 Created claim: summary (P836): The scope of work in the project includes:— construction of a sewerage network:13.06 km — Chapter of the combined network:0.48 km, construction of storm-water drainage network:0.32 km — reconstruction of water supply system:0.84 km — purchase of 3-axial municipal machine for recycling:1 unitsModernisation of the water treatment plant — 1.The planned number of population equivalents connected to the project is 930 p.e. of individual consumers., A...

18 February 2020

8 February 2020

31 January 2020

14 January 2020