Revision history of "Management of rainwater through the construction of rainwater drainage and reservoirs in Białystok" (Q85097)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 59,988 bytes +10 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 59,978 bytes −8 Set a claim value: summary (P836): O principal objetivo do projeto é melhorar o sistema de gestão das águas pluviais em Białystok, que não está adaptado à evolução das condições climáticas. O âmbito material do projeto inclui: 1. Obras de construção, incluindo: Tarefa 1 para construir drenos de águas pluviais na intersecção de Al Streets. João Paulo II – Forças Armadas Nacionais; Tarefa n.o 2: construção de um reservatório em ul. Sr. Kleeberg; Tarefa n.o 3 para construir uma equipa d...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 56,816 bytes +284 Changed label, description and/or aliases in da, it, sk, es, lt, sv, cs, bg, fi, de, ga, hr, el, lv, et, pt, ro, nl, fr, hu, sl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0204:02, 26 July 2022DG Regio talk contribs 54,415 bytes +33,498 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3616:36, 30 November 2021DG Regio talk contribs 13,605 bytes +1,752 Created claim: summary (P836): L’objectif principal du projet est d’améliorer le système de gestion des eaux de pluie dans la ville de Białystok, qui n’est pas adapté à l’évolution des conditions climatiques. Le champ d’application matériel du projet est: 1. Travaux de construction comprenant: La tâche no 1 consiste à construire un système d’eau de pluie à l’intersection des rues Al. Jean-Paul II — Forces armées nationales; Tâche no 2 construction d’un réservoir de rétention...
  • curprev 16:3616:36, 30 November 2021DG Regio talk contribs 11,853 bytes +172 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 12,121 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 11,963 bytes −152 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 12,115 bytes +1,561 Created claim: summary (P836): The main objective of the project is to improve the rainwater management system in Białystok, which is not adapted to changing climatic conditions. The project’s material scope includes: 1. Construction works including: Task 1 to build rainwater drains at the intersection of Al Streets. John Paul II – National Armed Forces; Task No. 2 construction of storage tank at ul. Mr Kleeberg; Task No. 3 to build a team of cleaning appliances ul. It’s mild...
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 10,554 bytes −1,149 Removed claim: summary (P836): The main aim of the project is to improve the rainwater management system in the City of Białystok unsuited to changing climatic conditions.The material scope of the project is:1.Construction work including:Task No 1 construction of storm water sewerage at the intersection of the streets of Al.John Paul II — National Armed Forces;Task No 2 construction of a retention tank at ul.KLEIEBGA;Task No 3 construction of a team of cleaning equipment ul...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 10,422 bytes +1,149 Created claim: summary (P836): The main aim of the project is to improve the rainwater management system in the City of Białystok unsuited to changing climatic conditions.The material scope of the project is:1.Construction work including:Task No 1 construction of storm water sewerage at the intersection of the streets of Al.John Paul II — National Armed Forces;Task No 2 construction of a retention tank at ul.KLEIEBGA;Task No 3 construction of a team of cleaning equipment ul.M...

18 February 2020

8 February 2020

31 January 2020

14 January 2020