Revision history of "Liquidation of the Wilkovye Boil Plant in Tychy." (Q85018)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 47,795 bytes +7 Changed label, description and/or aliases in pt
  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 47,788 bytes +20 Set a claim value: summary (P836): O projeto consiste na construção de uma rede de aquecimento constituída por tubos pré-isolados com isolamento térmico espesso, juntamente com uma instalação de corte e uma estação de bombagem adequadas para estabilizar a pressão disponível. O ponto de partida será a câmara de aquecimento na rua. O exército polaco, onde é estabelecida uma rede pré-isolada e, por último, o ponto de inclusão na rede pré-isolada existente em ul. Chama-se Podleska.

23 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

3 March 2023

  • curprev 00:2600:26, 3 March 2023DG Regio talk contribs 45,375 bytes −226 Changed label, description and/or aliases in it, da, sk, lv, ga, ro, sv, et, cs, fi, sl, de, hr, bg, el, es, lt, fr, pt, nl, hu, mt, and other parts

27 October 2022

26 October 2022

20 October 2022

13 August 2022

  • curprev 17:1817:18, 13 August 2022DG Regio talk contribs 43,505 bytes +25,674 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 15:2915:29, 30 November 2021DG Regio talk contribs 12,341 bytes +1,290 Created claim: summary (P836): Le projet consiste en la construction d’un réseau de chauffage à partir de tuyaux pré-isolés avec isolation thermique épaissie, ainsi que d’un raccord d’arrêt approprié et d’une station de pompage pour stabiliser la pression disponible. Le point de départ sera la chambre de chauffage à ul. L’armée polonaise où est géré le réseau pré-isolé, et la fin — le point d’incorporation dans le réseau pré-isolé existant à ul. C’est Podleska., translated_su...
  • curprev 15:2915:29, 30 November 2021DG Regio talk contribs 11,051 bytes +117 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,374 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,267 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,367 bytes +1,271 Created claim: summary (P836): The project consists of the construction of a heating network made of pre-insulated pipes with thick thermal insulation, together with a suitable cut-off fitting and pumping station to stabilise the available pressure. The starting point will be the heating chamber at the street. The Polish Army, where a pre-insulated network is established, and finally – the point of inclusion in the existing pre-insulated network at ul. It’s called Podleska.,...
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 10,096 bytes −776 Removed claim: summary (P836): The project consists of the construction of a district heating network from pre-insulated pipes with thermal insulation with a suitable sealing plate and pumping station stabilising the control pressure.The starting point will be the heating chamber at ul.The Polish army has a preisolated network and the end of the network — the point of inclusion in an existing pre-insulated network at ul.Podleska., remove_old_english_translation

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 9,582 bytes +776 Created claim: summary (P836): The project consists of the construction of a district heating network from pre-insulated pipes with thermal insulation with a suitable sealing plate and pumping station stabilising the control pressure.The starting point will be the heating chamber at ul.The Polish army has a preisolated network and the end of the network — the point of inclusion in an existing pre-insulated network at ul.Podleska., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020