Revision history of "Thermal modernisation of district heating networks in Gdynia and Wejherowo" (Q84796)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 84,407 bytes −41 Set a claim value: summary (P836): O principal objetivo e o resultado esperado do projeto é melhorar a eficiência energética do sistema operado pela OPEP, reduzindo as perdas na distribuição de calor nas redes Gdynia-Rumia, através das quais cerca de 88 % do calor é distribuído aos clientes da OPEP. O projeto enquadra-se em exemplos de tipos de projetos indicados na Descrição pormenorizada do eixo prioritário do Programa Operacional Infraestruturas e Ambiente 2014-2020 no ponto 1: «r...

20 March 2024

15 January 2024

14 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1617:16, 13 August 2022DG Regio talk contribs 78,179 bytes +50,246 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1616:16, 30 November 2021DG Regio talk contribs 16,499 bytes +2,858 Created claim: summary (P836): L’objectif principal et le résultat attendu du projet est d’améliorer l’efficacité énergétique du système exploité par l’OPEP en réduisant les pertes sur la distribution de chaleur sur les réseaux Gdynia-Rumia à travers lesquels environ. 88 % de la chaleur distribuée aux clients de l’OPEP. Le projet fait partie des types de projets figurant dans la description détaillée de l’axe prioritaire du programme opérationnel «Infrastructure et environnem...
  • curprev 16:1616:16, 30 November 2021DG Regio talk contribs 13,641 bytes +134 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 13,947 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 13,814 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 13,951 bytes +2,382 Created claim: summary (P836): The main objective and expected result of the project is to improve the energy efficiency of the system operated by OPEC by reducing losses on heat distribution on the Gdynia-Rumia networks, through which approx. 88 % heat distributed to OPEC customers. The project fits into examples of types of projects indicated in the Detailed Description of the Priority Axis of the Infrastructure and Environment Operational Programme 2014-2020 in item 1: “re...
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 11,569 bytes −2,093 Removed claim: summary (P836): The main objective and expected result of implementing the project is the improvement of the energy efficiency of the system operated by OPEC by reducing heat distribution losses on the Gdynia-Rumia networks through which it has arrived around.88 % of the heat distributed to OPEC customers.The project is part of an example of the types of projects identified in the Detailed Description of Priority Axes of the Operational Programme Infrastructu...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5409:54, 4 March 2020DG Regio talk contribs 12,371 bytes +2,093 Created claim: summary (P836): The main objective and expected result of implementing the project is the improvement of the energy efficiency of the system operated by OPEC by reducing heat distribution losses on the Gdynia-Rumia networks through which it has arrived around.88 % of the heat distributed to OPEC customers.The project is part of an example of the types of projects identified in the Detailed Description of Priority Axes of the Operational Programme Infrastructure...

18 February 2020

8 February 2020

31 January 2020

14 January 2020