Revision history of "Construction of the Black-Pasikurowice line with the extension of the station in this line" (Q84427)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:1906:19, 13 October 2024DG Regio talk contribs 59,684 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:1906:19, 13 October 2024DG Regio talk contribs 59,685 bytes −18 Set a claim value: summary (P836): O projeto prevê a construção de uma linha de duas vias de 400 kV Czarna-Pasikurowice com um comprimento de cerca de 133 km de vias atuais (incluindo a construção de um novo troço da linha de duas vias — aprox. 50 km e a modernização aprox. 33 km), juntamente com a expansão da estação nesta linha. A rota planeada atravessa a área de 10 municípios da voivodia de Dolnośląskie (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, Oborniki...

20 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:2022:20, 2 March 2023DG Regio talk contribs 56,948 bytes −22 Changed label, description and/or aliases in lv, it, da, sk, pt, lt, es, sv, ro, hu, de, ga, fr, bg, fi, hr, el, nl, et, sl, cs, mt, and other parts

2 December 2022

25 October 2022

19 October 2022

26 July 2022

  • curprev 03:4603:46, 26 July 2022DG Regio talk contribs 50,006 bytes +29,839 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 13,553 bytes +1,535 Created claim: summary (P836): Le projet prévoyait la construction d’une double voie de 400 kV ligne Czarna-Pasikurowice d’une longueur d’environ 133 km de voies actuelles (y compris la construction d’une nouvelle section de la ligne à deux voies — environ. 50 km et modernisation env. 33 km) avec l’extension de la station sur cette ligne. L’itinéraire prévu passe par 10 communes de voïvodie de Dolnośląskie (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska, Miękinia, O...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,018 bytes +146 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 11,899 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 11,750 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 11,918 bytes +1,500 Created claim: summary (P836): The project envisages the construction of a two-track line of 400 kV Czarna-Pasikurowice with a length of about 133 km of current tracks (including the construction of a new section of the two-track line – approx. 50 km, and modernisation approx. 33 km) along with the expansion of the station in this line. The planned route runs through the area of 10 communes of Dolnośląskie Voivodeship (Lubin, Ścinawa, Prochowice, Ruja, Malczyce, Środa Śląska,...
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 10,418 bytes −1,095 Removed claim: summary (P836): The project provides for the construction of a double-track line of 400 kV Czarna-Passikurowice with a length of approximately 133 km of current track (including the construction of a new section of line track — ca.50 km and modernisation ca.33 km) with the extension of the station within that linear line.The planned route runs through the territory of the 10 municipalities of the Dolnośląskie region (Lubin, Ścinawa, Prochowice, Ruja, Malczyce...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 10,230 bytes +1,095 Created claim: summary (P836): The project provides for the construction of a double-track line of 400 kV Czarna-Passikurowice with a length of approximately 133 km of current track (including the construction of a new section of line track — ca.50 km and modernisation ca.33 km) with the extension of the station within that linear line.The planned route runs through the territory of the 10 municipalities of the Dolnośląskie region (Lubin, Ścinawa, Prochowice, Ruja, Malczyce,...

18 February 2020

8 February 2020

31 January 2020

14 January 2020