Revision history of "Improvement the transport accessibility in Brest and Biala Podlaska" (Q77322)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

2 December 2022

3 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 14:1514:15, 30 November 2021DG Regio talk contribs 13,780 bytes +2,146 Created claim: summary (P836): La mise en œuvre de systèmes automatiques de gestion du trafic (ATM) est l’objectif du projet à Brest. L’introduction des guichets automatiques permettra de réduire le temps de circulation dans les rues de Brest, avec l’accès ultérieur au corridor transeuropéen II (E-30). Il est prévu d’augmenter la capacité du réseau routier jusqu’à 15-20 %, de réduire le taux d’accidents de 10-15 %, de réduire la période de conduite de 10 à 15 %, d’augmenter l...
  • curprev 14:1514:15, 30 November 2021DG Regio talk contribs 11,634 bytes +136 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 10:1010:10, 14 October 2020DG Regio talk contribs 11,525 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:1010:10, 14 October 2020DG Regio talk contribs 11,399 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:1010:10, 14 October 2020DG Regio talk contribs 11,525 bytes +2,001 Created claim: summary (P836): The implementation of automatic traffic management systems (ATMs) is the aim of the project in Brest. The introduction of ATMs will reduce the time of traffic working in the streets of Brest, with subsequent access to the TRANS-European corridor II (E-30). It is expected to increase the capacity of the road network up to 15-20 %, to reduce the accident rate by 10-15 %, to reduce driving period by 10 to 15 %, to increase transit attraction. The p...
  • curprev 10:1010:10, 14 October 2020DG Regio talk contribs 9,524 bytes −1,401 Removed claim: summary (P836): The implementation of automatic traffic management systems (ATMS) is the aim of the project in Brest.The introduction of ATMS will reduce the time of traffic working in the ets of Brest.It is expected to increase the capacity of the work network up to 1520 %, a reduction trajectory of 10 to 15 %, the increase transit ATTRACTION.The project in Biala Podlaska stresses of the crossing of the crossing of Terebelska street and national road no 2, a...

17 July 2020

16 June 2020

9 June 2020

7 June 2020

6 June 2020

26 March 2020

4 March 2020

  • curprev 08:5108:51, 4 March 2020DG Regio talk contribs 11,521 bytes +1,401 Created claim: summary (P836): The implementation of automatic traffic management systems (ATMS) is the aim of the project in Brest.The introduction of ATMS will reduce the time of traffic working in the ets of Brest.It is expected to increase the capacity of the work network up to 1520 %, a reduction trajectory of 10 to 15 %, the increase transit ATTRACTION.The project in Biala Podlaska stresses of the crossing of the crossing of Terebelska street and national road no 2, and...

18 February 2020

8 February 2020

31 January 2020

13 January 2020