Revision history of "Cycling through the Vltava River near TJ Meteor, České Budějovice" (Q74759)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 51,865 bytes +10 Changed label, description and/or aliases in pt
  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 51,855 bytes +5 Set a claim value: summary (P836): O objetivo do projeto é a construção de um comboio de bicicleta separado, que converte o caminho para peões e ciclistas através do rio Vltava no TJ Meteor, incluindo ligações às estradas existentes em ambos os lados. Trata-se de uma ponte com um campo perpendicular com um comprimento de ponte de 39,13 m e uma largura de 3 m. Será construída uma nova ciclovia de 121 metros e reconstruídos 24 metros. Ao construir uma nova ciclovia, a rede de ciclovias...

12 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:4415:44, 25 July 2022DG Regio talk contribs 48,658 bytes +27,960 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 14,555 bytes +1,451 Created claim: summary (P836): L’objet du projet est la construction d’une piste cyclable distincte qui transfère le sentier pour les piétons et les cyclistes à travers le lit de la rivière Vltava près de TJ Meteor, y compris la connexion aux routes existantes sur les deux rives. C’est un pont avec un champ perpendiculaire d’une longueur de pont de 39,13 m et d’une largeur de 3 m. Nouveaument, 121 mètres de piste cyclable seront construits et 24 mètres seront rénovés. La cons...
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 13,104 bytes +134 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,419 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,292 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,412 bytes +1,383 Created claim: summary (P836): The object of the project is the construction of a separate cycle train, which converts the path for pedestrians and cyclists across the river Vltava river at TJ Meteor, including connections to existing roads on both sides. It is a bridge with one perpendicular field with a length of bridging 39.13 m and a width of 3 m. A new 121 metres of cycle path will be built and 24 metres will be reconstructed. By building a new cycle path, the network of...
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 12,029 bytes −891 Removed claim: summary (P836): The purpose of the project is the construction of a separate cyclone, transferring footpaths and cyclists, to the river Vltava in TJ Meteor, including links to existing roads on both sides. This is a lying area of a perpendicular field of 39.13 m length and a width of 3 m. it shall be built 121 metres of cycle paths and 24 metres of length will be reconstructed. By creating a new cycle path, the network of cycle paths will be expanded. There w...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:0806:08, 27 February 2020DG Regio talk contribs 11,652 bytes +891 Created claim: summary (P836): The purpose of the project is the construction of a separate cyclone, transferring footpaths and cyclists, to the river Vltava in TJ Meteor, including links to existing roads on both sides. This is a lying area of a perpendicular field of 39.13 m length and a width of 3 m. it shall be built 121 metres of cycle paths and 24 metres of length will be reconstructed. By creating a new cycle path, the network of cycle paths will be expanded. There wil...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020