Revision history of "Cycling route Y – Industrial, Baarova" (Q74440)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0915:09, 13 October 2024DG Regio talk contribs 51,468 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:0915:09, 13 October 2024DG Regio talk contribs 51,466 bytes −3 Set a claim value: summary (P836): A construção do trilho destinado aos ciclistas estará ligada aos trilhos e percursos cicláveis urbanos existentes ao longo da ciclovia Y da cidade. Após a entrada em funcionamento de toda a construção, um trânsito seguro e confortável através da área na fronteira de dois distritos em direção ao norte-sul, numa localidade cheia de importantes empregadores e povoações de instituições e autoridades importantes. Construir um caminho com exploração separ...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:2115:21, 25 July 2022DG Regio talk contribs 48,795 bytes +28,248 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 14,543 bytes +1,472 Created claim: summary (P836): La construction d’un itinéraire conçu pour les cyclistes reliera les pistes cyclables urbaines existantes et les itinéraires le long de la route cyclable de la ville Y. Après la mise en service de l’ensemble de la construction, un transit sûr et confortable sera possible à la frontière de deux districts urbains dans la direction nord-sud, dans un endroit plein d’importants employeurs et établissements de grandes institutions et autorités. Constr...
  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 13,071 bytes +105 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,415 bytes +98 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,317 bytes −99 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,416 bytes +1,402 Created claim: summary (P836): The construction of the path intended for cyclists will be connected with existing urban cycling trails and routes along the city’s cycle route Y. After the whole construction is put into operation, a safe and comfortable transit through the area at the border of two districts in the direction of the north-south, in a locality full of important employers and settlements of important institutions and authorities. Build a path with separate operat...
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 12,014 bytes −921 Removed claim: summary (P836): The construction of the cycle used for cyclists will be linked to existing urban bicycle paths and routes on the route of the city route, Y. Following full construction, safe and comfort transit through the intersection of two urban districts in the north-south direction, the site of the full prominent employers and the seats of the relevant institutions and offices will be provided. To build a path with a separate use of walking and cycling i...

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1206:12, 27 February 2020DG Regio talk contribs 11,644 bytes +921 Created claim: summary (P836): The construction of the cycle used for cyclists will be linked to existing urban bicycle paths and routes on the route of the city route, Y. Following full construction, safe and comfort transit through the intersection of two urban districts in the north-south direction, the site of the full prominent employers and the seats of the relevant institutions and offices will be provided. To build a path with a separate use of walking and cycling in...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020