Revision history of "Insulation of the common house in the village Bystré" (Q73363)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0515:05, 13 October 2024DG Regio talk contribs 51,715 bytes −13 Set a claim value: summary (P836): A aldeia Bystré digna de aquecer uma casa social no centro da aldeia, que serve para atividades sociais. A casa da comunidade é amplamente utilizada pelos cidadãos da aldeia e inúmeros eventos culturais ocorrem aqui. O projeto incluirá o isolamento da fachada, janelas, portas e teto. O edifício da Casa Social encontra-se atualmente em condições insatisfatórias em termos de técnica térmica. A construção será realizada na st.p. n.o 86/1, com uma área...

7 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

1 June 2023

17 February 2023

25 July 2022

  • curprev 14:0214:02, 25 July 2022DG Regio talk contribs 48,026 bytes +27,888 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 13,974 bytes +1,451 Created claim: summary (P836): Le village de Bystré est digne d’isoler une maison sociale dans le centre du village, qui sert aux activités fédérales. La maison sociale est largement utilisée par les citoyens du village et de nombreux événements culturels ont lieu ici. Le projet comprendra l’isolation de la façade, des fenêtres, des portes et du plafond. La construction de la Maison sociale est actuellement dans un état insatisfaisant du point de vue de l’ingénierie thermique...
  • curprev 01:0801:08, 29 November 2021DG Regio talk contribs 12,523 bytes +118 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,854 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,742 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 12,851 bytes +1,387 Created claim: summary (P836): The village Bystré worthy to heat up a social house in the center of the village, which serves for social activities. The community house is widely used by the citizens of the village and numerous cultural events take place here. The project will include insulation of the facade, windows, doors and ceiling. The building of the Social House is currently in unsatisfactory condition in terms of thermally technical. The construction will be realised...
  • curprev 20:5520:55, 23 October 2020DG Regio talk contribs 11,464 bytes −911 Removed claim: summary (P836): The municipality is perfectly capable of bringing the building to a social house in the centre of the municipality, which serves the purpose of federal activities. It is widely used by the citizens of the municipality and numerous cultural events are being held. The project will include hot facades, windows, doors and caps. The object of the Social House is currently at a heat-technical unsuitable status. The construction will be carried out a...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

26 February 2020

  • curprev 20:0420:04, 26 February 2020DG Regio talk contribs 11,096 bytes +911 Created claim: summary (P836): The municipality is perfectly capable of bringing the building to a social house in the centre of the municipality, which serves the purpose of federal activities. It is widely used by the citizens of the municipality and numerous cultural events are being held. The project will include hot facades, windows, doors and caps. The object of the Social House is currently at a heat-technical unsuitable status. The construction will be carried out at...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020