Revision history of "DOZ Ostrava Svinov – Petrovice u Karviné st. hr. and Dětmarovice (outside) – Mosty u Jablunkova st. hr." (Q72276)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 12:5512:55, 13 October 2024DG Regio talk contribs 51,278 bytes +4 Changed label, description and/or aliases in pt
  • curprev 12:5512:55, 13 October 2024DG Regio talk contribs 51,274 bytes −13 Set a claim value: summary (P836): O objeto da construção é a conceção de um sistema de equipamento de sinalização telecomandado (DOZ), incluindo ligações a sistemas de informação existentes. A construção foi dividida em duas fases por razões técnicas e temporais: A primeira fase da construção é resolvida pelo DOZ no troço Ostrava Svinov – Petrovice u Karviné st. hr. e a segunda fase resolve o DOZ no troço Dětmarovice – Mosty u Jablunkova st. hr. A construção não inclui obras e forne...

23 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 11:3911:39, 25 July 2022DG Regio talk contribs 49,599 bytes +28,946 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

3 December 2021

29 November 2021

  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 15,130 bytes +1,487 Created claim: summary (P836): L’objet de la construction est la conception du système d’équipement de signalisation télécommandé (DOZ), y compris les liaisons avec les systèmes d’information existants. La construction a été divisée en deux étapes pour des raisons techniques et temporelles: La première étape de la construction est résolue par DOZ dans la section Ostrava Svinov — Petrovice u Karviné st. hr. et la 2ème étape est résolue par DOZ dans la section Dětmarovice — Mos...
  • curprev 00:5800:58, 29 November 2021DG Regio talk contribs 13,643 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,921 bytes +171 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,750 bytes −161 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 13,911 bytes +1,391 Created claim: summary (P836): The object of the construction is the design of a system of remotely controlled signalling equipment (DOZ) including links to existing information systems. The construction was divided into two stages for technical and time reasons: The 1st phase of the construction is solved by the DOZ in the section Ostrava Svinov – Petrovice u Karviné st. hr. and 2nd stage then solves DOZ in the section Dětmarovice – Mosty u Jablunkova st. hr. The constructio...
  • curprev 21:2421:24, 23 October 2020DG Regio talk contribs 12,520 bytes −908 Removed claim: summary (P836): The subject of the work is the design of the remotely controlled signalling system (Doz) with links to existing information systems. The construction was divided into two stages for technical and temporal reasons: The 1th stage of the construction is covered by DOZ in the stretch of Ostrava Svinov — Petrovice with Karviné. and Stage 2 in the Děčín section — Mostu u Jablunkova Lhr. The works and supplies relating to Bohumon-passenger stations a...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 19:5019:50, 26 February 2020DG Regio talk contribs 11,743 bytes +908 Created claim: summary (P836): The subject of the work is the design of the remotely controlled signalling system (Doz) with links to existing information systems. The construction was divided into two stages for technical and temporal reasons: The 1th stage of the construction is covered by DOZ in the stretch of Ostrava Svinov — Petrovice with Karviné. and Stage 2 in the Děčín section — Mostu u Jablunkova Lhr. The works and supplies relating to Bohumon-passenger stations are...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020