Revision history of "Trail for pedestrians and cyclists Doksy – Obora" (Q63726)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:4720:47, 12 October 2024DG Regio talk contribs 50,429 bytes 0 Changed label, description and/or aliases in pt
  • curprev 20:4720:47, 12 October 2024DG Regio talk contribs 50,429 bytes +2 Set a claim value: summary (P836): O objetivo do projeto é — através da construção de um caminho misto para peões e ciclistas — permitir que os residentes e visitantes da cidade de Doksy circulem em segurança a pé ou de bicicleta entre a parte central da cidade e a sua parte local — associar a aldeia de Obora e, assim, aumentar a percentagem destes modos de transporte no total dos transportes na cidade. O resultado do projeto é um percurso misto para peões e ciclistas com um comprime...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 14:5914:59, 24 July 2022DG Regio talk contribs 46,725 bytes +27,184 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 23:3423:34, 28 November 2021DG Regio talk contribs 13,732 bytes +1,368 Created claim: summary (P836): L’objectif du projet est — en construisant un sentier mixte pour les piétons et les cyclistes — de permettre aux habitants et aux visiteurs de Doksy de se déplacer en toute sécurité à pied ou à vélo entre la partie centrale de la ville et sa partie locale — la commune associée d’Obora, augmentant ainsi la part de ces modes de transport dans le transport total de la ville. Le résultat du projet est un sentier mixte pour les piétons et les cyclist...
  • curprev 23:3423:34, 28 November 2021DG Regio talk contribs 12,364 bytes +109 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 12,704 bytes +109 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 12,595 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 12,712 bytes +1,311 Created claim: summary (P836): The aim of the project is – through the construction of a mixed path for pedestrians and cyclists – to allow residents and visitors of Doksy city to move safely on foot or by bike between the core part of the town and its local part – associated village Obora and thus increase the share of these modes of transport in the total transport in the city. The result of the project is a mixed path for pedestrians and cyclists with a length of 772 m and...
  • curprev 14:0014:00, 23 October 2020DG Regio talk contribs 11,401 bytes −727 Removed claim: summary (P836): The aim of the project is to enable the inhabitants and visitors of the Doksa city to move safely on foot or to a round between the core part of a city and its local area, to increase the modal share of the city’s total transport in the city. The project results in a mixed walking and cycling pathway of 772 m and a width of 2,5 and 2 m respectively., remove_old_english_translation

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:3111:31, 26 February 2020DG Regio talk contribs 10,342 bytes +727 Created claim: summary (P836): The aim of the project is to enable the inhabitants and visitors of the Doksa city to move safely on foot or to a round between the core part of a city and its local area, to increase the modal share of the city’s total transport in the city. The project results in a mixed walking and cycling pathway of 772 m and a width of 2,5 and 2 m respectively., Adding English summary

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020