Revision history of "Sidewalk along road III/21313 hays – Františkovy Lázně" (Q62095)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 08:3808:38, 13 October 2024DG Regio talk contribs 51,830 bytes −1 Changed label, description and/or aliases in pt
  • curprev 08:3808:38, 13 October 2024DG Regio talk contribs 51,831 bytes +15 Set a claim value: summary (P836): Para garantir a segurança dos peões no povoamento intravilano de feno (parte de Františkovy Lázně) foi concebida uma calçada parcialmente bilateral ao longo da estrada de classe III n.o 21313. O percurso I do pavimento é projetado no comprimento de 105,98 m, o percurso II no comprimento de 269,20 m. Ambos os passeios estão equipados com linhas de guia para cegos e cegos e quadros reduzidos e medidas para a passagem segura e parada para pessoas com m...

7 March 2024

15 January 2024

22 December 2023

19 June 2023

12 June 2023

17 February 2023

24 July 2022

  • curprev 10:5910:59, 24 July 2022DG Regio talk contribs 48,626 bytes +27,903 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:3921:39, 2 December 2021DG Regio talk contribs 16,094 bytes +1,455 Created claim: summary (P836): Um die Sicherheit der Fußgänger im Intravilan der Siedlung Hayland (Teil von Františkovy Lázně) zu gewährleisten, ist ein teilweise zweiseitiger Gehweg entlang der Straße III. Klasse 2131313 geplant. Route I des Gehsteigs ist in der Länge von 105,98 m, Route II mit einer Länge von 269,20 m ausgelegt. Beide Gehsteige sind mit Führungslinien für den schwachsichtigen und blinden und reduzierten Rahmen sowie eine Maßnahme für den sicheren Durchgang...
  • curprev 21:3921:39, 2 December 2021DG Regio talk contribs 14,639 bytes +134 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 23:0723:07, 28 November 2021DG Regio talk contribs 14,505 bytes +1,425 Created claim: summary (P836): Afin d’assurer la sécurité des piétons dans l’intravilan de la colonie Hayland (partie de Františkovy Lázně), un trottoir partiellement recto-verso le long de la route III. classe 21313 est conçu. L’itinéraire I de la chaussée est conçu dans la longueur de 105,98 m, la route II d’une longueur de 269,20 m. Les deux chaussées sont équipées de lignes de guidage pour le cadre faible et aveugle et une mesure de sécurité de passage et d’arrêt pour les...
  • curprev 23:0723:07, 28 November 2021DG Regio talk contribs 13,080 bytes +132 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 13:4313:43, 23 October 2020DG Regio talk contribs 13,397 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:4313:43, 23 October 2020DG Regio talk contribs 13,279 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:4313:43, 23 October 2020DG Regio talk contribs 13,401 bytes +1,335 Created claim: summary (P836): To ensure the safety of pedestrians in the intravilan settlement of hay (part of Františkovy Lázně) is designed partially bilateral sidewalk along the III. class road No. 21313. The path I of the pavement is designed in the length of 105.98 m, route II in length 269.20 m. Both sidewalks are equipped with guide lines for the blind and blind and reduced frames and measures for safe passage and stop for persons with reduced mobility. Part of the bu...
  • curprev 13:4313:43, 23 October 2020DG Regio talk contribs 12,066 bytes −847 Removed claim: summary (P836): A partly two-way walkway along Class III 21313 is designed to ensure the safety of the pedestrian in the intractable fixture. The path I of the walkway is designed with a length of 105.98 m, a path II with a length of 269.20 m. walls of pavements are fitted with lines for partially vision, blind and reduced-reverse, and a safe passage and stop measures for persons with reduced mobility. The building components are the drainage of pavements and...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

26 March 2020

19 March 2020

26 February 2020

  • curprev 11:3011:30, 26 February 2020DG Regio talk contribs 11,134 bytes +847 Created claim: summary (P836): A partly two-way walkway along Class III 21313 is designed to ensure the safety of the pedestrian in the intractable fixture. The path I of the walkway is designed with a length of 105.98 m, a path II with a length of 269.20 m. walls of pavements are fitted with lines for partially vision, blind and reduced-reverse, and a safe passage and stop measures for persons with reduced mobility. The building components are the drainage of pavements and 1...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

11 January 2020