Revision history of "Lusatia – maintenance work on the assembly area" (Q58831)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 20:2620:26, 12 October 2024DG Regio talk contribs 46,086 bytes +1 Changed label, description and/or aliases in pt
  • curprev 20:2620:26, 12 October 2024DG Regio talk contribs 46,085 bytes +13 Set a claim value: summary (P836): O projeto tem por objeto trabalhos de manutenção na área de montagem que consistem na troca de superfícies de asfalto impermeáveis por estacas de granito com juntas de areia. As superfícies impermeáveis atuais são drenadas por duas entradas de chuva para a ETAR. A substituição da superfície permitirá que a água da chuva substitua a sua precipitação.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

24 July 2022

  • curprev 04:5004:50, 24 July 2022DG Regio talk contribs 43,400 bytes +24,268 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 21:4121:41, 2 December 2021DG Regio talk contribs 15,166 bytes +1,200 Created claim: summary (P836): Gegenstand des Projektes sind Wartungsarbeiten auf dem Montagebereich, die darin bestehen, undurchlässige Asphaltzementflächen durch Sandverbindungsgranitschnitte zu ersetzen. Die bestehenden undurchlässigen Flächen werden durch zwei Regenabflüsse in das WWTP entwässert. Durch den Austausch der Oberfläche kann Regenwasser an der Stelle seines Fallouts infiltriert werden., translated_summary
  • curprev 21:4121:41, 2 December 2021DG Regio talk contribs 13,966 bytes +105 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:2522:25, 28 November 2021DG Regio talk contribs 13,861 bytes +1,230 Created claim: summary (P836): Le projet porte sur les travaux d’entretien de la zone d’assemblage consistant à remplacer des surfaces asphaltées et cimenteuses imperméables par des boutures de granit à joint de sable. Les zones imperméables existantes sont drainées dans la station d’épuration par deux drains de pluie. Le remplacement de la surface permettra l’infiltration de l’eau de pluie sur le site de ses retombées., translated_summary
  • curprev 22:2522:25, 28 November 2021DG Regio talk contribs 12,631 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

23 October 2020

  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 12,965 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 12,857 bytes −104 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 12,961 bytes +1,130 Created claim: summary (P836): The object of the project is maintenance work on the assembly area consisting of exchanging impermeable asphaltcement surfaces for granite cuttings with sand joints. The current impermeable surfaces are drained by two rain inlets to the WWTP. Replacing the surface will allow rainwater in place of its fallout., translated_summary
  • curprev 10:3010:30, 23 October 2020DG Regio talk contribs 11,831 bytes −737 Removed claim: summary (P836): The object of the project is the maintenance work on an assembly area consisting of the exchange of an impermeable asphalt surface for the areas of high sand blasting machines. The existing impermeable surfaces are two storm water overflows to the wastewater treatment plant. Exchange of the surface will make it possible to land rainwater at the point of assembly., remove_old_english_translation

24 September 2020

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:5010:50, 26 February 2020DG Regio talk contribs 11,281 bytes +737 Created claim: summary (P836): The object of the project is the maintenance work on an assembly area consisting of the exchange of an impermeable asphalt surface for the areas of high sand blasting machines. The existing impermeable surfaces are two storm water overflows to the wastewater treatment plant. Exchange of the surface will make it possible to land rainwater at the point of assembly., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020