Revision history of "UPGRADES... IN PROGRESS 2 EDITION" (Q586612)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

29 August 2022

27 August 2022

24 July 2022

  • curprev 04:2904:29, 24 July 2022DG Regio talk contribs 57,408 bytes +38,101 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

10 February 2022

7 February 2022

29 January 2022

11 January 2022

19 December 2021

9 December 2021

13 November 2020

  • curprev 04:4604:46, 13 November 2020DG Regio talk contribs 10,996 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 04:4604:46, 13 November 2020DG Regio talk contribs 10,904 bytes −90 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 04:4604:46, 13 November 2020DG Regio talk contribs 10,994 bytes +1,780 Created claim: summary (P836): THE PROJECT STEMS FROM THE NEED TO RAISE THE LEVEL OF BASIC SKILLS AND TO IMPROVE THE TRAINING OF THE INSTITUTE IN ORDER TO AVOID THE MOST POSSIBLE CASES OF SCHOOL FAILURE AND ABANDONMENT. THE DESIGN PLANT IS IN CLOSE CONTINUITY WITH THAT RELATING TO THE FIRST EDITION NOTICE 1953 OF 21022017 REPLICATING IN FACT THE INTERVENTIONS THAT WILL START FROM SEPTEMBER 2018 A.S. 20182019. IN THIS WAY, THE SCHOOL INTENDS TO ENSURE THE CONTINUITY OF ACTIONS...
  • curprev 04:4604:46, 13 November 2020DG Regio talk contribs 9,214 bytes −1,244 Removed claim: summary (P836): THE PROJECT STEMS FROM THE NEED TO RAISE THE LEVEL OF BASIC SKILLS AND TO IMPROVE THE TRAINING OF DELLISTITUTO IN ORDER TO AVOID THE POSSIBLE CASES OF SCHOOL FAILURE AND ABANDONMENT. THE DESIGN OF THE PROJECT IS CLOSELY LINKED TO THAT OF THE FIRST 1953 EDITION OF 21022017, IN WHICH THE MEASURES TO BE TAKEN SINCE SEPTEMBER 2018 WERE LAUNCHED IN. IN THIS WAY, THE SCHOOL AIMS TO ENSURE THAT ACTIONS IN THE DIFFERENT AREAS ARE CONTINUE WITH A TWO-Y...

31 October 2020

15 July 2020

7 June 2020

23 March 2020

  • curprev 14:2514:25, 23 March 2020DG Regio talk contribs 10,029 bytes +1,244 Created claim: summary (P836): THE PROJECT STEMS FROM THE NEED TO RAISE THE LEVEL OF BASIC SKILLS AND TO IMPROVE THE TRAINING OF DELLISTITUTO IN ORDER TO AVOID THE POSSIBLE CASES OF SCHOOL FAILURE AND ABANDONMENT. THE DESIGN OF THE PROJECT IS CLOSELY LINKED TO THAT OF THE FIRST 1953 EDITION OF 21022017, IN WHICH THE MEASURES TO BE TAKEN SINCE SEPTEMBER 2018 WERE LAUNCHED IN. IN THIS WAY, THE SCHOOL AIMS TO ENSURE THAT ACTIONS IN THE DIFFERENT AREAS ARE CONTINUE WITH A TWO-YEA...

20 March 2020

18 March 2020

10 March 2020

25 February 2020