Revision history of "ALL TOGETHER FORWARD ALL TOGETHER" (Q532050)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

23 July 2022

  • curprev 15:4815:48, 23 July 2022DG Regio talk contribs 56,458 bytes +37,315 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

11 February 2022

10 February 2022

7 February 2022

29 January 2022

10 January 2022

18 December 2021

8 December 2021

12 November 2020

  • curprev 12:1812:18, 12 November 2020DG Regio talk contribs 10,953 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1812:18, 12 November 2020DG Regio talk contribs 10,861 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1812:18, 12 November 2020DG Regio talk contribs 10,945 bytes +1,774 Created claim: summary (P836): THE PROJECT AIMS TO CONTRIBUTE TO THE ESTABLISHMENT OF AN EDUCATIONAL NETWORK OF TERRITORY IN COLLABORATION WITH LOCAL BODY CULTURAL AND SPORTS INSTITUTIONS AND OTHER SCHOOLS. THE ACTIONS OF THE PROJECT ARE PART OF THE VISION DELLISITUTO INCLUSIVE 22 FORMED LAST YEAR AND WITH A SECONDARY SCHOOL OF FIRST DEGREE STILL TO BE BUILT MATERIALLY TO DEVELOP LIDENTIT OF INCLUSIVE INSTITUTE AVOIDING THAT THIS IS SIMPLY THE SUM OF SECONDARY SCHOOL TO THE I...
  • curprev 12:1812:18, 12 November 2020DG Regio talk contribs 9,171 bytes −1,280 Removed claim: summary (P836): THE PROJECT AIMS TO CONTRIBUTE TO THE ESTABLISHMENT OF A LOCAL EDUCATIONAL NETWORK IN COOPERATION WITH LOCAL AND CULTURAL INSTITUTIONS AND OTHER SCHOOLS. THE PROJECT’S ACTIONS ARE CARRIED OUT IN VISION DELLISITUTO’S VISION 22, WHICH HAS BEEN SET UP LAST YEAR AND WITH A LOWER SECONDARY SCHOOL THAT IS STILL TO BE PHYSICALLY BUILT TO DEVELOP LIMIT IDENTITY OF AN INSTITUTE, INCLUDING THE FACT THAT THIS IS SIMPLY THE SUM OF THE SECONDARY SCHOOL TO...

30 October 2020

16 July 2020

7 June 2020

20 March 2020

18 March 2020

10 March 2020

4 March 2020

  • curprev 23:1023:10, 4 March 2020DG Regio talk contribs 9,140 bytes +1,280 Created claim: summary (P836): THE PROJECT AIMS TO CONTRIBUTE TO THE ESTABLISHMENT OF A LOCAL EDUCATIONAL NETWORK IN COOPERATION WITH LOCAL AND CULTURAL INSTITUTIONS AND OTHER SCHOOLS. THE PROJECT’S ACTIONS ARE CARRIED OUT IN VISION DELLISITUTO’S VISION 22, WHICH HAS BEEN SET UP LAST YEAR AND WITH A LOWER SECONDARY SCHOOL THAT IS STILL TO BE PHYSICALLY BUILT TO DEVELOP LIMIT IDENTITY OF AN INSTITUTE, INCLUDING THE FACT THAT THIS IS SIMPLY THE SUM OF THE SECONDARY SCHOOL TO TH...

25 February 2020