Revision history of "Engineering study and project management mission for design and works — Phase 2" (Q3700572)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 11:4411:44, 10 October 2024DG Regio talk contribs 46,808 bytes +2 Changed label, description and/or aliases in pt
  • curprev 11:4411:44, 10 October 2024DG Regio talk contribs 46,806 bytes −20 Set a claim value: summary (P836): A fase 2 do projeto de consolidação das margens do canal de acesso à cidade de Ouanary consiste, por um lado, na realização de uma missão de estudo de engenharia que determina a viabilidade de um programa de conceção que combina um aspeto técnico e financeiro acessível e, por outro, numa missão de gestão do projeto para o projeto e as obras. A longo prazo, é necessário fortalecer o dique cujas encostas arrancam da base que forma o banco de acordo co...

22 March 2024

12 January 2024

19 June 2023

10 June 2023

8 June 2023

12 August 2022

  • curprev 00:1900:19, 12 August 2022DG Regio talk contribs 43,570 bytes +29,460 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 11:1111:11, 1 December 2021DG Regio talk contribs 9,673 bytes +1,277 Created claim: summary (P836): Phase 2 des Projekts „Verstärkung der Ufer des Zufahrtskanals in Ouanary“ besteht zum einen in der Durchführung eines Engineering-Studienauftrags, in dem die Machbarkeit eines Planungsprogramms mit erschwinglichem technischem und finanziellem Aspekt ermittelt wird, und zum anderen in der Planungs- und Bauleitung. Letztlich geht es darum, den Deich zu festigen, dessen Hänge sich vom Sockel abreißen, der das Ufer je nach starken Gezeiten bildet.,...

27 November 2021

  • curprev 14:0414:04, 27 November 2021DG Regio talk contribs 8,396 bytes −1,336 Removed claim: summary (P836): La phase 2 du projet de confortement des berges du canal d‚accès au bourg de Ouanary consiste d‘une part en la réalization d‚une mission d‘étude d‚engineering d‘engineering déterminant la faisabilité d‚un programme de Concept Alliant aspects technique et financier abordable et d‘autre part, d‚une mission de maîtrise d‘œuvre de concept et de travaux. Il s‚agit à terme de conforter la digue don not les Pentes s‘arrachent du socle qui forme la be...
  • curprev 01:3901:39, 27 November 2021DG Regio talk contribs 9,732 bytes +1,336 Created claim: summary (P836): La phase 2 du projet de confortement des berges du canal d‚accès au bourg de Ouanary consiste d‘une part en la réalization d‚une mission d‘étude d‚engineering d‘engineering déterminant la faisabilité d‚un programme de Concept Alliant aspects technique et financier abordable et d‘autre part, d‚une mission de maîtrise d‘œuvre de concept et de travaux. Il s‚agit à terme de conforter la digue don not les Pentes s‘arrachent du socle qui forme la berg...

26 November 2021

24 November 2021

22 November 2021

  • curprev 11:5211:52, 22 November 2021DG Regio talk contribs 7,839 bytes +140 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5211:52, 22 November 2021DG Regio talk contribs 7,699 bytes +1,305 Created claim: summary (P836): Phase 2 of the project to consolidate the banks of the access canal to the town of Ouanary consists of, on the one hand, carrying out an engineering study mission determining the feasibility of a design programme combining an affordable technical and financial aspect and, on the other hand, a project management mission for design and works. In the long run, it is necessary to strengthen the dyke whose slopes rip off from the base which forms the...

17 November 2021