Revision history of "Water rescue plan — Renewal of the network in Sainte-anne and Gosier — Safeguarding of the Jolan Reservoir." (Q3685254)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 11:4311:43, 10 October 2024DG Regio talk contribs 51,595 bytes +6 Changed label, description and/or aliases in pt
  • curprev 11:4311:43, 10 October 2024DG Regio talk contribs 51,589 bytes +6 Set a claim value: summary (P836): No sector de Douville, a operação consiste na substituição dos dois tubos Poirier-Douville (sudução e distribuição) por um único tubo, assumindo todas as ligações e ligando esta rede ao piso de distribuição do reservatório de madeira de Jolan. No que diz respeito ao setor de Faraux em Gosier, o objetivo é renovar a rede de fibrocimento situada na estrada da subdivisão de Faraux e na estrada do Dr. Hélène até à giratória situada no final da avenida d...

22 March 2024

7 December 2023

11 June 2023

8 June 2023

11 August 2022

  • curprev 18:1818:18, 11 August 2022DG Regio talk contribs 46,606 bytes +31,284 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

14 January 2022

13 January 2022

6 December 2021

1 December 2021

  • curprev 08:3508:35, 1 December 2021DG Regio talk contribs 10,403 bytes +1,452 Created claim: summary (P836): Im Sektor Douville besteht das Vorhaben darin, die beiden Rohrleitungen von Poirier-Douville (Ableitung und Verteilung) durch eine einzige Rohrleitung zu ersetzen, alle Anschlüsse zu übernehmen und dieses Netz mit der Verteilungsstufe des Jolan-Holztanks zu verbinden. Was den Bereich Faraux au Gosier betrifft, so geht es darum, das Asbestzementnetz auf der Straße der Siedlung Faraux und der Straße von Dr. Hélène bis zum Giratorium am Ende des Bo...

27 November 2021

  • curprev 14:0814:08, 27 November 2021DG Regio talk contribs 8,951 bytes −1,547 Removed claim: summary (P836): Sur le secteur de Douville, l‚opération consiste à remplacer les deux canalisations de Poirier -Douville (Adduction et distribution) par une canalization unique, de reprendre l‘ensemble des branchements et de connecter ce réseau à l’étage de distribution du réservoir de bois Jolan. Besorgt ensuite le secteur de Faraux au Gosier, il s‚agit de renouveler le réseau en amiante-ciment situé sur la route du lotissement Faraux et la route du docteur...
  • curprev 00:0400:04, 27 November 2021DG Regio talk contribs 10,498 bytes +1,547 Created claim: summary (P836): Sur le secteur de Douville, l‚opération consiste à remplacer les deux canalisations de Poirier -Douville (Adduction et distribution) par une canalization unique, de reprendre l‘ensemble des branchements et de connecter ce réseau à l’étage de distribution du réservoir de bois Jolan. Besorgt ensuite le secteur de Faraux au Gosier, il s‚agit de renouveler le réseau en amiante-ciment situé sur la route du lotissement Faraux et la route du docteur Hé...

26 November 2021

24 November 2021

18 November 2021

  • curprev 18:0418:04, 18 November 2021DG Regio talk contribs 8,339 bytes +171 Changed label, description and/or aliases in en: translated_label
  • curprev 18:0418:04, 18 November 2021DG Regio talk contribs 8,168 bytes +1,462 Created claim: summary (P836): In the Douville sector, the operation consists of replacing the two Poirier-Douville pipes (suduction and distribution) with a single pipe, taking over all the connections and connecting this network to the distribution floor of the jolan wood reservoir. With regard to the Faraux sector in Gosier, the aim is to renew the asbestos-cement network located on the road of the Faraux subdivision and the road of Dr. Hélène to the giratory located at th...

17 November 2021